BLD15-01083
| FIRE-Final Inspection | 8/20/2015 | 8/20/2015 | 8/20/2015 3:23:01 PM | P | PASS |
|
|
life safety passed
|
FIR15-00578
| INSP-Final Inspection | 8/20/2015 | 8/20/2015 | 8/20/2015 2:46:39 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00701
| INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 2:41:10 PM | A | FAIL |
|
|
See the city approved plans for building area where I tested today. Some corrections have been noted. Not all construction is complete or fire alarm installed.
|
BLD15-00412
| FIRE-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 2:32:13 PM | P | FAIL |
|
|
Provide annual inspection for the two fire extinguishes.
|
BLD15-02511
| FIRE-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 1:55:48 PM | A | FAIL |
|
|
Project is not ready for a final yet. I went over life safety requirements with the general contractor. I noted that there is not water to the building yet and the fire sprinkler system is not complete. The fire alarm system appears to be partially installed and also is not connected to the not installed fire sprinkler riser. Walls have been framed but without coverings and doors.
|
FIR15-00578
| INSP-Sprinkler Rough-in | 8/20/2015 | 8/20/2015 | 8/20/2015 1:48:42 PM | P | PASS |
|
|
Permit finaled
|
FIR15-00255
| INSP-Sprinkler Rough-in/Hydro | 8/19/2015 | 8/20/2015 | 8/20/2015 11:09:37 AM | A | CANC |
|
|
Underground hydo test already passed
|
FIR14-00475
| INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 11:08:47 AM | A | PASS |
|
|
Permit finaled
|
FIR15-00443
| INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 11:07:27 AM | A | PASS |
|
|
Permit finaled
|
BLD15-02090
| FIRE-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 10:42:11 AM | A | FAIL |
|
|
Repair all exit signs and emergency lights. Provide updated inspections for the hood suppression system and fire extinguishers.
|
FIR15-00503
| INSP-Sprinkler Rough-in | 8/19/2015 | 8/20/2015 | 8/20/2015 10:24:13 AM | A | PASS |
|
|
The overhead rough-in passed and piping can be covered except at the wall where the insulation needs to be installed in the stud bays and at the locations for the missing branch line restraints. No riser has been installed/built. Underground supply has not been connected at the street yet.
|
FIR15-00444
| INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 9:17:15 AM | A | PASS |
|
|
Permit finaled
|
FIR15-00216
| INSP-Sprinkler Rough-in | 8/19/2015 | 8/20/2015 | 8/20/2015 7:51:27 AM | A | PASS |
|
|
Tenting passed. Rough-in passed. Piping can be covered.
|
FIR15-00349
| INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 7:44:59 AM | A | PASS |
|
|
Permit finaled
|
FIR15-00360
| INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 7:44:25 AM | A | PASS |
|
|
Permit finaled
|
FIR15-00579
| INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 7:43:52 AM | A | PASS |
|
|
Permit finaled
|