MEC18-04003
| Rough-in | 8/19/2018 | 8/20/2018 | 8/20/2018 3:51:05 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- need acca report onsite couldnt find one- 2nd floor exhaust fan just hanging out between trusses- are you doing fireplace? if so needs completed- water heater b vent laying in garage against supply duct not installed
|
MEC18-04003
| Pressure Test | 8/19/2018 | 8/20/2018 | 8/20/2018 3:48:49 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass
|
MEC18-03578
| Final | 8/20/2018 | 8/20/2018 | 8/20/2018 2:29:02 PM | P | PASS |
|
|
Please call home owner at ###-#### for access. Phone #: ###-#### Inspection requested via web by terry Warden- furnace a/c coil co ok
|
MEC18-03460
| Rough-in | 8/20/2018 | 8/20/2018 | 8/20/2018 2:00:12 PM | P | PASS |
|
|
Light test on grease duct. Will be ready by 1:00 Phone #: ###-#### Inspection requested via web by Drew Tverdy- light test pass on 1- 8' piece 14x24- 1- 2' a4x24 to 14x15 transition- 1 14x15 90 degree and 32" of 14x15- need to add smoker to permit and update valuation and pay fee before next inspection
|
MEC18-04061
| Rough-in | 8/20/2018 | 8/20/2018 | 8/20/2018 12:02:13 PM | P | PASS |
|
|
cover for bathrooms Phone #: ###-#### Inspection requested via web by Robin Cox- seal on duct above bath rooms ok- need to insulate 10' of supply duct above bathroom hard lid- ok for cover- recall in inspection when rest of install is complete and sealed
|
MEC18-03821
| Pressure Test | 8/20/2018 | 8/20/2018 | 8/20/2018 11:24:40 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN Inspection cancelled from web by: GREGORY ANDERSEN
|
MEC18-03821
| Rough-in | 8/20/2018 | 8/20/2018 | 8/20/2018 11:24:38 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN Inspection cancelled from web by: GREGORY ANDERSEN
|
MEC18-03518
| Final | 8/20/2018 | 8/20/2018 | 8/20/2018 9:42:06 AM | A | PASS |
|
|
furnace a/c coil co ok
|
MEC18-03518
| Rough-in | 8/19/2018 | 8/20/2018 | 8/20/2018 9:41:19 AM | A | CANC |
|
|
As per the previous inspection, all the rubber flexible couplings were replaced with more appropriate PVC unions; a cleanout Tee was added right downstream to the outlet of the furnace exhaust. The vent piping was pressurized at 5 psig for more than 48h without any change in the gauge. The threaded test plug in the cleanout Tee and the pressure gauge, along with the air compressor will be available for a live test. As in previous occasions, call Tona at ###-#### or Nicole at ###-#### about 25 minutes before to drive to the condo.
Thanks! Phone #: ###-#### Inspection requested via web by Nicole Yogerst
|
MEC15-02431
| Mec-Aging Inspection | 8/20/2018 | 8/20/2018 | 8/20/2018 8:47:59 AM | | PASS |
|
|
|
MEC15-02431
| DOC - Permit Expired | 8/20/2018 | 8/20/2018 | 8/20/2018 8:47:46 AM | A | PASS |
|
|
no response from contractor
|
MEC18-04027
| Final | 8/20/2018 | 8/20/2018 | 8/20/2018 8:37:05 AM | A | NH |
|
|
customer request inspector to be there at 8:30? Phone #: ###-#### Inspection requested via web by Aaron Alandt- no answer to door- still need to witness flue test- need to reschedule
|
MEC17-05321
| Mec-Aging Inspection | 8/20/2018 | 8/20/2018 | 8/20/2018 8:14:24 AM | | FAIL |
|
|
needs inspection called in
|