BLD18-02741
| BLD-Final | 8/17/2018 | 8/20/2018 | 8/21/2018 9:00:41 AM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting
|
BLD17-03128
| BLD-Final | 8/20/2018 | 8/20/2018 | 8/20/2018 3:44:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darrell Gogert. Ok for temp occ. Will be ok for perm occ. once plumbing and electrical sign perm.
|
BLD16-04499
| BLD-Framing/Rough-in | 8/20/2018 | 8/20/2018 | 8/20/2018 2:58:56 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Window at mid landing required tobe tempered. @hr. firewall not o bottom of roof deck upstairs. Need to fire block fir out wall upstairs.. Ok to insulate. Correction notice posted.
|
BLD16-04498
| BLD-Framing/Rough-in | 8/20/2018 | 8/20/2018 | 8/20/2018 2:57:24 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Strap double top plate at 1/2 inch gas pipe penetration. Nail off simpson hangar on 2ply girder truss upsatirs. Window next to shower requied to be tempered. Ok to insulate. Correction notice posted.
|
BLD16-04494
| BLD-Final | 8/20/2018 | 8/20/2018 | 8/20/2018 2:28:34 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Needs MEP finals first.
|
BLD16-04470
| BLD-Final | 8/20/2018 | 8/20/2018 | 8/20/2018 2:26:37 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Complete fire caulking in garage. Still needs plumbing final. Correction notice issued.
|
BLD16-04470
| BLD-Blower Door Test Results | 8/20/2018 | 8/20/2018 | 8/20/2018 2:25:56 PM | P | DONE |
|
|
5.8ACH @50pa
|
BLD16-04472
| BLD-Final | 8/20/2018 | 8/20/2018 | 8/20/2018 2:22:26 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04472
| DOC - Permit Finaled | 8/20/2018 | 8/20/2018 | 8/20/2018 2:22:18 PM | P | PASS |
|
|
|
BLD16-04472
| BLD-Blower Door Test Results | 8/20/2018 | 8/20/2018 | 8/20/2018 2:22:03 PM | P | DONE |
|
|
5.6ACH @50pa
|
BLD16-04459
| BLD-Final | 8/20/2018 | 8/20/2018 | 8/20/2018 1:47:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04459
| DOC - Permit Finaled | 8/20/2018 | 8/20/2018 | 8/20/2018 1:47:33 PM | P | PASS |
|
|
|
BLD16-04459
| BLD-Blower Door Test Results | 8/20/2018 | 8/20/2018 | 8/20/2018 1:44:39 PM | P | DONE |
|
|
5.9ACH @50pa
|
BLD16-04455
| BLD-Final | 8/20/2018 | 8/20/2018 | 8/20/2018 1:44:04 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Needs to install code compliant handrail. Everything elese ok.
|
BLD16-04455
| BLD-Blower Door Test Results | 8/20/2018 | 8/20/2018 | 8/20/2018 1:44:03 PM | P | DONE |
|
|
6.8ACH @50pa
|
BLD16-04476
| BLD-Final | 8/20/2018 | 8/20/2018 | 8/20/2018 10:40:37 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Brown Inspection cancelled from web by: Sam Brown
|
BLD17-04256
| BLD-Energy code compliance | 8/20/2018 | 8/20/2018 | 8/20/2018 9:58:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD17-04254
| BLD-Energy code compliance | 8/20/2018 | 8/20/2018 | 8/20/2018 9:58:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD17-04255
| BLD-Energy code compliance | 8/20/2018 | 8/20/2018 | 8/20/2018 9:58:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD17-04253
| BLD-Energy code compliance | 8/20/2018 | 8/20/2018 | 8/20/2018 9:58:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD18-02310
| BLD-Wall Bracing | 8/17/2018 | 8/20/2018 | 8/20/2018 8:36:52 AM | A | NR |
|
|
Shear wall - Bob Phone #: ###-####. Will reschedule.
|