BLD00-00766
| BLD-Framing/Rough-in | 8/17/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/17/2000 at 13:52:49. Contact: .cover demising ; c/n fireblox, spec insp reports 8/21/2000 11:40:56 AM
|
BLD99-02613
| BLD-Final | 8/18/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | A | PASS |
|
|
###-####; Mech. & Plbg not applicable, roof drain not modifi 8/21/2000 11:05:03 AM ed 8/21/2000 11:05:07 AM
|
BLD98-02283
| BLD-Framing/Rough-in | 8/18/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | A | PART |
|
|
Steve ###-####
|
BLD00-01996
| BLD-Framing/Rough-in | 8/18/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/18/2000 at 16:46:50. Contact: ###-####.need other insps, hdr's per plan, fireblox, etc 8/21/2000 10:51:16 AM
|
BLD00-02232
| BLD-Footing | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | A | PART |
|
|
Chad ###-#### poured 8/21/2000 9:02:37 AM
|
BLD00-02232
| BLD-Foundation | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | PART |
|
|
steam wall chad; this is the worst set of plans this week...but its only Monday! 8/21/2000 4:59:55 PM
|
BLD00-01539
| BLD-Framing/Rough-in | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | FAIL |
|
|
Definitive Properties ###-####; c/n, need eng'g. not per plan.per408 8/21/2000 4:17:58 PM
|
BLD00-01467
| BLD-Final | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | FAIL |
|
|
###-####, called left msg, no access 8/21/2000 4:38:55 PM
|
BLD00-00048
| BLD-Other | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 11:08:25. Contact: ###-####.called in error, plbg insp??? 8/21/2000 4:20:44 PM
|
MIS00-00184
| BLD-Final | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | FAIL |
|
|
call to meet there ###-#### Susan or Wayne ; final ok. mobile hm 8/21/2000 4:30:28 PM
|
BLD98-03861
| BLD-Conference | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 8/21/2000 w/ Tim Jordan re final...need stamped summary
|
BLD99-03630
| BLD-Conference | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 8/21/2000 w/ Dan S re resubmittal & phase 2 permit
|