BLD00-01112
| BLD-Framing/Rough-in | 8/18/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | A | FAIL |
|
|
Dwayne ###-#### c/n posted. 8/21/2000 3:00:14 PM
|
BLD00-02247
| BLD-Footing | 8/18/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | A | PART |
|
|
eric ###-#### appears ok ,no approved plans. 8/21/2000 12:46:26 PM
|
BLD00-02003
| BLD-Framing/Rough-in | 8/18/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | A | FAIL |
|
|
Murray ###-####
8/21/2000 9:54:14 AM n 8/21/2000 11:59:58 AM eeds all other inspections. 8/21/2000 12:00:14 PM
|
BLD00-01852
| BLD-Framing/Rough-in | 8/18/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | PASS |
|
|
shear wall nailing insp Jay ###-#### Done allready 8/22/2000 7:53:50 AM
|
BLD00-01324
| BLD-Energy code compliance | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | PASS |
|
|
rick ###-####
|
BLD00-02178
| BLD-Foundation | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 08:27:12. Contact: . 8/22/2000 7:54:24 AM Finished work appears okno right side stringline or people pre 8/22/2000 7:54:53 AMse 8/22/2000 7:54:54 AM t. 8/22/2000 7:54:57 AM. 8/22/2000 7:55:32 AM
|
BLD99-03319
| BLD-Energy code compliance | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 10:06:49. Contact: .
|
BLD00-01197
| BLD-Framing/Rough-in | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 10:28:22. Contact: ###-####. Unable to get this this day due to work load. 8/22/2000 7:56:09 AM
|
BLD00-02257
| BLD-Footing | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | FAIL |
|
|
Randy ###-####no boards up at this time. 8/21/2000 3:02:10 PM
|
BLD00-00078
| BLD-Final | 8/21/2000 | 8/21/2000 | 8/21/2000 12:00:00 AM | P | FAIL |
|
|
Terry ###-#### crawl space walls not tight to rim insulation. 8/21/2000 3:34:02 PM
|