Inspections for the day of: Tuesday, August 21, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01265 BLD-Energy code compliance8/20/20018/21/20018/21/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/20/2001 at 11:11:44. Contact: ###-####. Frame pass 8/21/2001 9:53:42 AM
MEC01-02179 Rough-in8/20/20018/21/20018/21/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/20/2001 at 11:15:13. Contact: . Wrong house called in. Contacted Sub to straighten out. 8/21/2001 10:09:38 AM
BLD01-01294 BLD-Final8/20/20018/21/20018/21/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/20/2001 at 12:53:48. Contact: ###-####. C/C issued. 8/21/2001 1:19:43 PM
BLD01-01144 BLD-Framing/Rough-in8/20/20018/21/20018/21/2001 12:00:00 AMAFAIL
###-#### loran C/N 8/21/2001 9:16:31 AM
MEC01-02020 Final8/20/20018/21/20018/21/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/20/2001 at 17:15:25. Contact: ###-####.
BLD01-01420 BLD-Framing/Rough-in8/21/20018/21/20018/21/2001 12:00:00 AMPFAIL
tod ###-####
BLD01-01420 BLD-Framing/Rough-in8/21/20018/21/20018/21/2001 12:00:00 AMPFAIL
tod ###-#### shear wall C/N.....Misc shear. 8/21/2001 4:00:32 PM
MEC01-01963 Final8/21/20018/21/20018/21/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/21/2001 at 08:43:36. Contact: ###-####.
BLD00-02246 BLD-Other8/21/20018/21/20018/21/2001 12:00:00 AMPPART
PROFIT Mtg. today @ 1:30 : )
MEC01-01756 Final8/20/20018/21/20018/21/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/20/2001 at 15:01:29. Contact: ###-####.
BLD01-00745 BLD-Final8/20/20018/21/20018/21/2001 12:00:00 AMPFAIL
###-#### / ###-#### anita C/N....Need previous corr notice. 8/21/2001 3:16:26 PM