FIR02-00265
| INSP-Sprinkler Rough-in/Hydro | 8/20/2002 | 8/21/2002 | 8/21/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 14:46:51. Contact: ###-####. hydro and flush okay 8/21/2002 3:51:07 PM
|
FIR02-00265
| INSP-Final Inspection | 8/21/2002 | 8/21/2002 | 8/21/2002 12:00:00 AM | P | PASS |
|
|
|
FIR02-00265
| INSP-Supply line flush | 8/20/2002 | 8/21/2002 | 8/21/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 14:45:43. Contact: ###-####. hydro and flush okay 8/21/2002 3:51:19 PM
|