Inspections for the day of: Wednesday, August 21, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-02117 Final8/20/20028/21/20028/21/2002 12:00:00 AMACANC
JUDY ###-####..ductwork only 8/20/2002 3:50:13 PM
MEC02-01824 Final8/20/20028/21/20028/21/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/20/2002 at 14:15:08. Contact: ###-####.
MEC02-02122 Final8/20/20028/21/20028/21/2002 12:00:00 AMAFAIL
###-####..they added fixtures..OFF PIERCE PARK 8/21/2002 12:48:57 PM GAS PIPE UNDERSIZED 8/21/2002 2:08:33 PM ..NEED 1" ALL THE WAY TO DRYER.. TALKED TO CONT 8/21/2002 2:08:58 PM
MEC02-02298 Pressure Test8/20/20028/21/20028/21/2002 12:00:00 AMAFAIL
###-#### brandon GAS PIPE UNDERSIZED..TALKED TO GAS FITTER 8/21/2002 11:27:52 AM
MEC02-02141 Rough-in8/21/20028/21/20028/21/2002 12:00:00 AMPNR
robin; Phone #: ###-####..OFF COLLISTER 8/21/2002 12:49:58 PM...###-#### 8/21/2002 2:43:38 PM
MEC02-02340 Rough-in8/21/20028/21/20028/21/2002 12:00:00 AMPFAIL
###-#### or ###-#### POSTED CORRECTIONS...TALKED TO SUPER 8/21/2002 4:19:15 PM
MEC02-02340 Pressure Test8/21/20028/21/20028/21/2002 12:00:00 AMPFAIL
MEC02-02117 Final8/21/20028/21/20028/21/2002 12:00:00 AMPFAIL
greg; Phone #: ###-#### HANG FLEX DUCT PER UMC 8/21/2002 4:42:32 PM
MEC02-02247 Pressure Test8/20/20028/21/20028/21/2002 12:00:00 AMPPASS
CHECKED FOR STATE INSPECTION TAG..GAS FINALED 8/21/2002 2:53:29 PM