Inspections for the day of: Wednesday, August 21, 2002.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03643 FIRE-Conference8/20/20028/21/20028/21/2002 12:00:00 AMADONE
building has been built 8' south than the original plan shows thus narrowing one of the fire dept access roads. I told contractor that he needs to converse with Richard Dailey to verify if the narrower road will be OK. 8/21/2002 9:27:57 AM
BLD02-00645 FIRE-Final Inspection8/20/20028/21/20028/21/2002 12:00:00 AMAPASS
fire life/safety finaled 8/21/2002 11:59:45 AM
FIR02-00211 INSP-Final Inspection8/21/20028/21/20028/21/2002 12:00:00 AMAFAIL
after flow of water the alarms rang in 40 seconds but the exterior alarm bell did not operate and needs replaced.
BLD02-00937 FIRE-Final Inspection8/21/20028/21/20028/21/2002 12:00:00 AMPPART
A temporary occupancy is being given for the fire alarm and the life safety per Steve Minnis's with the Boise Fire Dept. permission until the approved fire alarm plans and any modifications are made 8/23/2002 11:18:40 AM
BLD01-02601 FIRE-Final Inspection8/20/20028/21/20028/21/2002 12:00:00 AMPPASS
fire life/safety, fire alarm and fire sprinkler finaled 8/22/2002 9:13:14 AM
FIR02-00311 INSP-Sprinkler Rough-in/Hydro8/20/20028/21/20028/21/2002 12:00:00 AMPPART
sprinklers in telemarketing area is OK for cover except for retaining staps and eq bracing needing to be brought up to code 8/21/2002 2:07:32 PM
BLD02-00311 FIRE-Conference8/20/20028/21/20028/21/2002 12:00:00 AMPDONE
I spoke with the contractor about phasing of the project will need the approval of the fire dept 8/21/2002 3:09:12 PM