FIR06-00101
| INSP-Sprinkler Rough-in | 8/18/2006 | 8/21/2006 | 8/21/2006 4:10:28 PM | P | PART |
|
|
c/n items related to the 1st floor rough-in have been completed, 2nd floor guest rooms are okay to cover.
|
FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 8/21/2006 | 8/21/2006 | 8/21/2006 4:09:06 PM | P | PART |
|
|
5th floor confrence rooms at the drop ceiling areas are good for cover.
|
BLD06-01488
| FIRE-Final Inspection | 8/17/2006 | 8/21/2006 | 8/21/2006 12:24:37 PM | A | NR |
|
|
jim-- ###-#### cell -call 1st before insp please Per contractor, project is not ready for final inspection at this time, to be rescheduled.
|
BLD06-01771
| FIRE-Final Inspection | 8/18/2006 | 8/21/2006 | 8/21/2006 11:48:42 AM | A | FAIL |
|
|
Need to provide current annual inspection certification tags for the fire extinguishers, one emergency light at the north exit does not function on battery backup.
|
MIS06-00209
| FIR-Final | 8/18/2006 | 8/21/2006 | 8/21/2006 11:15:05 AM | A | PASS |
|
|
Inspection passed, extra lockset at the main entry/exit door to be disabled- verified at final (structural) inspection.
|
BLD06-01589
| FIRE-Final Inspection | 8/18/2006 | 8/21/2006 | 8/21/2006 10:53:27 AM | A | PART |
|
|
c/n items related to the 2nd floor life safety have been completed. No inspections for the 1st floor have been done at this time regarding alarm, sprinkler, or life safety.
|
FIR06-00251
| INSP-Final Inspection | 8/18/2006 | 8/21/2006 | 8/21/2006 10:24:38 AM | A | NR |
|
|
Project is not ready for final inspection as requested, still need to adjust spacing at the north entry, main tie-in is not completed, will require ceiling tile and escutcheons in place prior to final.
|