Inspections for the day of: Monday, August 21, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00448 INSP-Sprinkler Rough-in8/21/20068/21/20068/21/2006 6:02:47 PMPPASS
The seven heads as shown on the plans are ok to cover
BLD06-01174 FIRE-Final Inspection8/21/20068/21/20068/21/2006 2:45:42 PMPPASS
Life safety finaled
BLD06-01174 FIRE-Final Inspection8/21/20068/21/20068/21/2006 2:07:01 PMPPASS
Life safety finaled
BLD06-00632 FIRE-Final Inspection8/21/20068/21/20068/21/2006 2:06:32 PMPPASS
Life safety finaled
FIR06-00452 INSP-Final Inspection8/21/20068/21/20068/21/2006 2:05:45 PMPPASS
permit finaled
FIR06-00452 INSP-Sprinkler Rough-in/Hydro8/18/20068/21/20068/21/2006 2:03:37 PMAPASS
permit finaled
FIR05-00536 INSP-Sprinkler Rough-in/Hydro8/18/20068/21/20068/21/2006 12:13:26 PMAPASS
Underground hydro test passed.
BLD05-02379 FIRE-Final Inspection8/18/20068/21/20068/21/2006 10:59:49 AMAFAIL
Need the fire alarm and fire sprinkler permits finaled. Life safety ok to final when that is done.
BLD06-01283 FIRE-Final Inspection8/18/20068/21/20068/21/2006 10:58:33 AMAPASS
Life safety finaled. Only the new construction areas as per the approved plans were inspected.
FIR06-00419 INSP-Final Inspection8/17/20068/21/20068/21/2006 10:57:13 AMAPASS
Permit finaled
FIR06-00213 INSP-Final Inspection8/18/20068/21/20068/21/2006 8:55:22 AMAPASS
Permit finaled
FIR06-00391 INSP-Final Inspection8/18/20068/21/20068/21/2006 8:53:46 AMAFAIL
The trouble and supervisory signals are latching on the facp and will need to be reprogrammed. Testing has been stopped.