Inspections for the day of: Tuesday, August 21, 2007.
Number of inspections: 17
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-02347 Extend Permit 180 days8/20/20078/20/2007 P 
BLD07-01658 FIRE-Final Inspection8/21/20078/21/20078/23/2007 11:24:24 AMPCANC
Reschedlued for 8/23 PM.
FIR07-00587 INSP-Final Inspection8/20/20078/21/20078/21/2007 5:29:46 PMPFAIL
The permit card, review notes, approved plan documents and inspection record paperwork are to be on site at all times for verification of code compliance at the time of field inspection per conditon of the permit.
FIR07-00660 INSP-Alarm Testing8/17/20078/21/20078/21/2007 5:25:27 PMPFAIL
System account information is not set up with the monitoring company, phone line troubles failed to report, need to complete NFPA record of inspection and testing prior to scheduling final field acceptance testing-see review notes item #2.
FIR07-00146 FIR-Aging Inspection8/21/20078/21/20078/21/2007 3:58:30 PM DEFR
Work in progress.
BLD07-00919 FIRE-Final Inspection8/21/20078/21/20078/21/2007 3:57:53 PMPPASS
Fire life safety finaled.
FIR07-00715 INSP-Final Inspection8/21/20078/21/20078/21/2007 3:56:49 PMPPASS
FA modification work passed inspection, permit finaled.
FIR07-00448 INSP-Sprinkler Rough-in/Hydro8/20/20078/21/20078/21/2007 3:53:48 PMPPART
AG hydrostatic test passed, verified resubmitted plans on site, overhead is NOT approved for cover at this time due to upright head obstructions by insulation at the deck, also missing cold cavity protection for piping above the riser room and reception area.
BLD07-01441 FIRE-Final Inspection8/21/20078/21/20078/21/2007 3:13:06 PMPFAIL
Need to provide weatherproof enclosure for the roof mounted duct detector and provide means for functionality testing.
BLD07-01067 FIRE-Final Inspection8/21/20078/21/20078/21/2007 3:11:23 PMPFAIL
Locking hardware at the door to the shared restroom is not allowed-see approved plan annotations, need to relocate exit sign or provide passage only hardware at this location, need to provide means for testing the duct detector.
FIR07-00603 INSP-Final Inspection8/20/20078/21/20078/21/2007 12:52:46 PMAPASS
Correction items are complete, fire sprinkler permit finaled.
BLD06-03408 FIRE-Final Inspection8/20/20078/21/20078/21/2007 12:36:39 PMAPART
Final pending correction of fire sprinkler coverage at the basement storage area due to a new wall which disrupts design density.
FIR07-00599 INSP-Final Inspection8/21/20078/21/20078/21/2007 12:12:08 PMPPASS
Required corrections have been completed, final inspection passed, fire alarm permit finaled.
BLD07-00917 FIRE-Final Inspection8/20/20078/21/20078/21/2007 12:10:49 PMAFAIL
Missing required exit signs as indicated on approved plan set for the second floor level, also need to install one EM light and repair one existing EM light as annotated, remainder of life safety is acceptable.
FIR07-00599 INSP-Final Inspection8/20/20078/21/20078/21/2007 12:07:51 PMAFAIL
One overspaced SD at the third floor corridor as previously noted has not been relocated, the remainder of c/n items are complete.
BLD07-01121 FIRE-Final Inspection8/20/20078/21/20078/21/2007 10:20:59 AMAPASS
Fire life safety is acceptable, one additonal PFE installed while on site at location as discussed.
FIR07-00624 INSP-Final Inspection8/21/20078/21/20078/21/2007 10:19:26 AMPPASS
Fire sprinkler permit for the TI modifications passed.