Inspections for the day of: Friday, August 21, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01105 FIRE-Final Inspection8/20/20098/21/20098/21/2009 6:47:11 PMPFAIL
See stamped plan set for locations of repair items including four non-functional exit signs, one EM light, provide one missing exit sign, remove one exit sign, provide two additional EM lights, loop road at the north end of the building is not finished, remainder of life safety okayed.
BLD09-00464 FIRE-Final Inspection8/20/20098/21/20098/21/2009 6:41:43 PMPPASS
Fire life safety passed per the scope of work.
FIR09-00033 INSP-Sprinkler Rough-in/Hydro8/21/20098/21/20098/21/2009 6:39:28 PMPFAIL
Overhead hydrostatic test for the class IIIB liquid rack system failed due to visible leakage at two locations.
FIR09-00033 INSP-Alarm Testing8/21/20098/21/20098/21/2009 6:37:53 PMPPART
Retest for failed pressure switch at rack system #27 passed, per contractor pretesting for double and single interlock preaction valve solenoid operations has been completed.
FIR09-00487 INSP-Final Inspection8/20/20098/21/20098/21/2009 6:34:55 PMAPART
Overhead fire sprinkler modifications per the scope of work at the remodel area are good for ceiling cover, final pending ceiling tile and escutcheons.
FIR09-00290 INSP-Final Inspection8/20/20098/21/20098/21/2009 6:32:33 PMAPART
Retest of the last DD at the dry goods warehouse and the newly installed DD at the shift exchange area passed, HVAC unit at the battery charging room is not ready for testing, DD at the maintenance bay failed to initiate unit shutdown-however was repaired and retested okay before inspection concluded, retest of failed pressure switch at system #27 passed. Need to provide building map at the panel indicating floorplan and location of all initiating devices with correct addressing and NFPA 72 Record of Completion forms prior to permit final, ammonia system/alarm interconnect test pending.
FIR09-00033 INSP-Sprinkler Rough-in8/14/20098/21/20098/21/2009 6:17:03 PMAPART
C/N items at the dry goods warehouse rack system verified for completion, final walkthrough at the dry goods office area okayed-one escutcheon installed while on site, corrections for obstructions at HVAC units in the dry goods warehouse are finished, fire sprinkler work below overhead pallet storage at the perishables docks is underway.
FIR08-00775 INSP-Final Inspection8/14/20098/21/20098/21/2009 7:24:00 AMACANC
We would like to continue the inspection on this school this morning, and then continue through the rest of the week at approximately the same time if that will work. Thank you, Jason ###-#### Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick