Inspections for the day of: Friday, August 21, 2009.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01250 BLD-Framing/Rough-in8/21/20098/21/20098/21/2009 6:43:33 PMPPASS
mick - first thing this afternoon if possible please Phone #: ###-####
BLD09-01062 BLD-Other8/20/20098/21/20098/21/2009 3:48:44 PMPPART
ceiling cover north of grid 3.5 please. Phone #: ###-#### Internet Inspection Request from: John Lodman. Pend. elec. ri.
BLD09-01208 BLD-Framing/Rough-in8/21/20098/21/20098/21/2009 3:12:00 PMPFAIL
We met with Franklin Building and are ready for you this afternoon. Phone #: ###-#### Internet Inspection Request from: Jon Hastings. Complete lateral bracing on a5 and a6 trusses. Provide tempered glazing at window by backdoor. ok to insul. c/n posted.
BLD09-01008 BLD-Final8/21/20098/21/20098/21/2009 3:10:42 PMPNR
Scheduled by a contractor via Hello! on 8/21/2009 at 9:14:18 AM. Contact: ###-####. All doors and hardware not installed.
BLD09-01204 BLD-Framing/Rough-in8/21/20098/21/20098/21/2009 2:34:30 PMPPASS
Joe Phone #: ###-####. Interior steel stud framing for walls and soffitt for lobbies on 2nd. and 3rd. floors only.
BLD09-00771 BLD-Aging Inspection8/21/20098/21/20098/21/2009 2:17:07 PM NR
ESC07-00528 DOC - Permit Expired8/21/20098/21/20098/21/2009 2:15:48 PMPPASS
Final stabalization was completed. Permit is expired.
ESC07-00534 Aging Inspection8/21/20098/21/20098/21/2009 2:14:15 PM DONE
ESC07-00534 DOC - Permit Expired8/21/20098/21/20098/21/2009 2:14:07 PMPPASS
Final stabalization was completed. Permit is expired.
BLD07-01834 BLD-Final8/20/20098/21/20098/21/2009 2:08:59 PMPNR
Brian Phone #: ###-####. elec failed in area to be inspected.
MIS09-00156 BLD-Conference8/20/20098/21/20098/21/2009 1:53:37 PMPDONE
Deena- call prior to going to set bond amount and check if up to code Phone #: ###-####. Bond set at $5,000.
BLD07-01846 BLD-Framing/Rough-in8/20/20098/21/20098/21/2009 11:36:04 AMAPASS
Ben Phone #: ###-####. 1st and 2nd. floor patient room seperation walls ok.
BLD09-01382 BLD-Final8/20/20098/21/20098/21/2009 11:34:41 AMAPASS
Rick Phone #: ###-####
BLD09-01382 DOC - Permit Finaled8/21/20098/21/20098/21/2009 11:34:34 AMPPASS
BLD09-01351 BLD-Footing8/20/20098/21/20098/21/2009 10:59:09 AMANR
todd Phone #: ###-####
ESC09-00505 Site Preparation8/21/20098/21/20098/21/2009 10:58:51 AMAPART
Needs to provide conc. washout area.
BLD09-01346 BLD-Footing8/20/20098/21/20098/21/2009 10:58:16 AMAPASS
todd Phone #: ###-####. Perimeter footings.
BLD09-00428 BLD-Framing/Rough-in8/20/20098/21/20098/21/2009 10:24:46 AMACANC
bill Phone #: ###-####
BLD09-00428 BLD-Conference8/21/20098/21/20098/21/2009 10:24:33 AMAPASS
bill Phone #: ###-####.. Looked at underfloor framing. Noted some equip. for low voltage. Noted to home owner to check if permit was required for low voltage prior to cover of floor.
ESC09-00457 Random Inspection8/21/20098/21/20098/21/2009 9:48:33 AMAPASS
BLD09-01208 BLD-Framing/Rough-in8/20/20098/21/20098/21/2009 9:48:17 AMAFAIL
Please call so we can plan to meet you out there. Thanks Phone #: ###-#### Internet Inspection Request from: Jon Hastings. Incomplete set of truss enginnering.
BLD07-02167 BLD-Final8/20/20098/21/20098/21/2009 9:21:07 AMAPART
Ray Phone #: ###-####. Temp occ. granted. Will be ok for perm occ once zoning has signed off.
BLD07-02160 BLD-Final8/20/20098/21/20098/21/2009 9:20:08 AMAPART
Ray Phone #: ###-####. Temp occ granted. Will be ok for perm occ. once zoning has signed off.