Inspections for the day of: Friday, August 21, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00524 Site Preparation8/21/20098/21/20098/21/2009 8:01:56 PM CANC
ESC09-00160 Tracking Control8/19/20098/21/20098/21/2009 8:01:44 PMAFAIL
Most of the tracking was cleaned up.

Verbal to RP:
Clean up all mortor residual off of the ground and place it into the washout that was provided.
Maintain all storm drain inlets within project area.
Clean up all tracking off of the hard surfaces.
Will be having a confrence with the RP on 8/24/09 AM.
ESC04-01055 BMP Violation8/12/20098/21/20098/21/2009 2:44:57 PMACANC
Moved until 8/24/09
ESC09-00513 Site Preparation8/19/20098/21/20098/21/2009 2:43:45 PMANR
ESC09-00519 Tracking Control8/20/20098/21/20098/21/2009 11:12:31 AMAPASS
ESC07-00467 Aging Inspection8/21/20098/21/20098/21/2009 11:12:15 AM DONE
ESC07-00467 DOC - Permit Finaled8/21/20098/21/20098/21/2009 11:12:02 AMPPASS