Inspections for the day of: Wednesday, August 21, 2013.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00095 INSP-Final Inspection8/20/20138/21/20138/21/2013 4:06:18 PMAFAIL
I stopped at the job site and found that the "well" has not been installed at the FDC as discussed. I also noted the signage at the bell is missing. I left Don a voice message.
BLD13-01683 FIRE-Final Inspection8/20/20138/21/20138/21/2013 4:03:33 PMACANC
Per Chris this will be rescheduled when the door and hardware has been installed.
FIR13-00320 INSP-Sprinkler Rough-in/Hydro8/20/20138/21/20138/21/2013 4:00:32 PMPPASS
East and west overhead systems passed hydro tests. Remaining sprinkler piping is ok to cover.
FIR13-00182 INSP-Alarm Testing8/20/20138/21/20138/21/2013 3:56:43 PMADONE
Provide map at the facp and NFPA 72 forms
FIR13-00182 INSP-Final Inspection8/20/20138/21/20138/21/2013 3:55:06 PMAFAIL
Provide map at the facp and NFPA 72 forms.
BLD13-01674 FIRE-Final Inspection8/20/20138/21/20138/21/2013 9:31:27 AMAPASS
Life safety passed
BLD13-01702 FIRE-Final Inspection8/20/20138/21/20138/21/2013 9:03:35 AMAPASS
Life safety passed.