FIR17-00409
| INSP-Sprinkler Rough-in | 8/21/2017 | 8/21/2017 | 8/21/2017 1:26:56 PM | P | CANC |
|
|
Rick Phone #: ###-####
|
FIR17-00217
| INSP-Sprinkler Rough-in/Hydro | 8/18/2017 | 8/21/2017 | 8/21/2017 9:52:08 AM | A | FAIL |
|
|
Hydrostatic test not ready for level 1, system had a fitting that was not glued, hydrostatic test for level 1 will be rescheduled.
|
BLD17-01500
| FIRE-Final Inspection | 8/19/2017 | 8/21/2017 | 8/21/2017 9:37:33 AM | A | CANC |
|
|
Project hasan attached FIR permit in issued status, fire inspection needs to be complete and passed before life fire saety inspection can be performed. This inspection request is cancelled.
|