PLM18-02703
| Water and/or Sewer | 8/20/2018 | 8/21/2018 | 8/21/2018 2:56:32 PM | A | FAIL |
|
|
Jason Phone #: ###-#### 1) the cleanout on the building sewer is installed backwards 2) remove 2" and 4" ABS fittings and replace with PVC at tie in. ( can't mix materials) 3) use approved glue 4) pressure test PVC and water piping. 5) use two clamps at each joint on the water service piping 6) sleeve water at sewer crossing, 10 feet on each side of crossing. 7) provide a tapped fitting on the pressure sewer at the sump to blow out sewer. 8) provide 3' of cover on pressure sewer and water lines.
|
PLM18-03500
| Groundwork | 8/20/2018 | 8/21/2018 | 8/21/2018 11:36:50 AM | P | PASS |
|
|
James Lewis is Journeyman on job ###-#### Phone #: ###-#### Inspection requested via web by Candice Martin
|
PLM18-03500
| Water and/or Sewer | 8/20/2018 | 8/21/2018 | 8/21/2018 11:36:17 AM | P | PASS |
|
|
ready for water line only inspection. James Lewis is journeyman on the job ###-####. Phone #: ###-#### Inspection requested via web by Candice Martin
|
PLM18-01818
| Plumbing Rough-in | 8/20/2018 | 8/21/2018 | 8/21/2018 11:11:54 AM | A | PART |
|
|
Eron Phone #: ###-#### water ok, waste is for the underfloor only.
|
PLM18-00497
| Final | 8/21/2018 | 8/21/2018 | 8/21/2018 10:31:03 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen correction not made
|
PLM18-03463
| Water and/or Sewer | 8/21/2018 | 8/21/2018 | 8/21/2018 10:21:07 AM | A | PASS |
|
|
|
PLM18-03463
| Final | 8/21/2018 | 8/21/2018 | 8/21/2018 10:20:51 AM | P | PASS |
|
|
|
PLM18-03463
| Water and/or Sewer | 8/21/2018 | 8/21/2018 | 8/21/2018 10:20:33 AM | A | PASS |
|
|
|
PLM18-01998
| Plumbing Rough-in | 8/20/2018 | 8/21/2018 | 8/21/2018 10:04:33 AM | A | PASS |
|
|
Jacob Phone #: ###-#### sewer ok to corner of building, capped.
|
PLM18-03374
| Groundwork | 8/20/2018 | 8/21/2018 | 8/21/2018 9:46:09 AM | A | PART |
|
|
24 hour interceptor test AM to AM Phone #: ###-#### Inspection requested via web by Ben Taylor start 24 hour interceptor test
|
PLM18-03570
| Water and/or Sewer | 8/20/2018 | 8/21/2018 | 8/21/2018 7:48:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford sw final ok
|
PLM18-03570
| Final | 8/21/2018 | 8/21/2018 | 8/21/2018 7:47:51 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford
|