BLD00-00286
| BLD-Foundation | 8/21/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | A | PART |
|
|
masonry Bruce ###-#### placed w/spical insp. pending report. 8/22/2000 10:25:37 AM
|
BLD99-03400
| BLD-Final | 8/21/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | A | PASS |
|
|
Dan ###-####
|
BLD00-01726
| BLD-Footing | 8/21/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 15:58:04. Contact: ###-####. cold joint in footing no horrizontal splice bar/ lap on horr bar not stagered spice at laps/ rain leader piping three locations not compacted under footing/ #4 bar tranverse to slab spacing over 3 ft spec. aprox. 40 to 42 inches o.c./ trench footing needs cleaned loose dirt. 8/22/2000 9:36:42 AM
|
BLD00-00851
| BLD-Final | 8/21/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 16:08:16. Contact: ###-####. l/c ok 8/22/2000 4:04:37 PM
|
BLD99-02010
| BLD-Final | 8/21/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 16:20:15. Contact: ###-####.
|
BLD00-01472
| BLD-Framing/Rough-in | 8/21/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 17:21:39. Contact: ###-####.
|
BLD00-01563
| BLD-Concrete | 8/21/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 17:48:04. Contact: ###-####. interior pands covered w/special insp pending reports for compliance. 8/22/2000 4:08:34 PM
|
BLD00-00286
| BLD-Foundation | 8/22/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | P | PART |
|
|
###-#### covered by special insp. pending report. 8/22/2000 2:59:06 PM
|
BLD00-01267
| BLD-Framing/Rough-in | 8/22/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | P | PASS |
|
|
reinspection 3rd floor John ###-####
|
BLD00-02113
| BLD-Framing/Rough-in | 8/22/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | P | CANC |
|
|
john ###-#### carl did insp. call from job. 8/22/2000 2:57:12 PM
|
BLD00-01489
| BLD-Framing/Rough-in | 8/21/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 16:29:05. Contact: ###-####.late as possible called and canclled. 8/22/2000 3:01:32 PM
|
BLD00-01845
| BLD-Framing/Rough-in | 8/18/2000 | 8/22/2000 | 8/22/2000 12:00:00 AM | P | PART |
|
|
slab ###-####\\will pour on Wed 3:00am rebar at perimtor of slab and wire mesh inplace ok pending special insp. report for concrete. 8/22/2000 3:59:36 PM
|