BLD01-01165
| BLD-Aging Inspection | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | | PART |
|
|
wip 8/22/2001 8:07:22 AM
|
MEC01-01582
| Final | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 07:28:44. Contact: ###-####.
|
BLD01-01095
| BLD-Framing/Rough-in | 8/21/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | PART |
|
|
re-insp ###-#### terry c/n issued- 8/22/2001 9:21:55 AM
|
BLD01-01599
| BLD-Energy code compliance | 8/21/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 10:24:58. Contact: ###-####. Cancelled by contractor via telephone 8/22/2001 10:50:52 AM
|
BLD01-01569
| BLD-Framing/Rough-in | 8/21/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | FAIL |
|
|
fr rick ###-#### c/n issued-no stamped truss package or address on house -2nd time requesting--did not perform framing inspection. 8/22/2001 9:35:56 AM
|
BLD01-01732
| BLD-Wall cover | 8/21/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 14:33:19. Contact: ###-####. c/n -- nails penetration is excessive-re-nailing needed. 8/22/2001 8:55:57 AM
|
BLD01-01887
| BLD-Wall cover | 8/21/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 16:51:21. Contact: . Ok to side--Need to verify 3-inside HD's installations at framing. 8/22/2001 10:10:24 AM
|
BLD00-02940
| BLD-Framing/Rough-in | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 07:54:46. Contact: ###-####. c/n additional nails required plus address on building needed. 8/22/2001 3:13:10 PM
|
BLD01-01975
| BLD-Footing | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PART |
|
|
###-#### mike late afternoon wip 8/22/2001 2:31:03 PM
|
BLD01-01238
| BLD-Wall cover | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 08:46:11. Contact: ###-####. ok to cover acc. ceiling pending electrical ok in 2nd floor area break, reading, etc. areas. 8/22/2001 1:00:52 PM
|
BLD01-00956
| BLD-Final | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PASS |
|
|
###-#### josh C. of C. #21580 issued 8/22/2001 1:54:08 PM
|
BLD01-00395
| BLD-Final | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | FAIL |
|
|
###-#### josh no address posted--did not perform inspection--talked to contractor 8/22/2001 1:37:18 PM
|
BLD01-00471
| BLD-Final | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | FAIL |
|
|
###-#### josh No address--did not perform the inspection--talked to contractor 8/22/2001 1:36:44 PM
|
BLD01-01364
| BLD-Energy code compliance | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PASS |
|
|
###-#### john
|
BLD01-01365
| BLD-Energy code compliance | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PASS |
|
|
###-#### john
|
BLD01-01732
| BLD-Wall cover | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 11:20:54. Contact: ###-####. ok to side 8/22/2001 1:13:27 PM
|
BLD01-01569
| BLD-Framing/Rough-in | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 11:25:08. Contact: ###-####. c/n do not insulate 8/22/2001 2:27:26 PM
|