MEC01-02449
| Final | 8/21/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 12:43:44. Contact: ###-####.
|
BLD01-01619
| BLD-Final | 8/21/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | NR |
|
|
###-#### bret note this was a rough frame but still needed mec and seal package 8/22/2001 11:16:49 AM
|
MEC01-02484
| Final | 8/21/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 14:08:23. Contact: ###-####.
|
MEC01-02449
| Pressure Test | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 8/22/2001 9:43:39 AM
|
MEC01-02484
| Rough-in | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 8/22/2001 10:08:05 AM still needs gas piping ran to fire place
|
MEC01-02407
| Rough-in | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PASS |
|
|
###-#### david
|
BLD01-00617
| BLD-Footing | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PASS |
|
|
okay by mike phillups to do footing inspection val ###-#### columns and ext stairs footings 8/22/2001 4:07:12 PM
|
MEC01-02407
| Pressure Test | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 425 On 8/22/2001 3:41:57 PM 60 psi from meter to furn 20 psi to appl
|
BLD01-01862
| BLD-Framing/Rough-in | 8/21/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | FAIL |
|
|
###-#### c/n on site 8/22/2001 2:01:27 PM
|
BLD01-01585
| BLD-Framing/Rough-in | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | FAIL |
|
|
###-#### gary shear nailing ok to cover east side only 8/22/2001 3:58:19 PM
|
BLD01-02006
| BLD-Framing/Rough-in | 8/22/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | PASS |
|
|
jp ###-#### shear nail
|
BLD01-00331
| BLD-Final | 8/14/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | NR |
|
|
###-####
|
BLD01-00332
| BLD-Final | 8/14/2001 | 8/22/2001 | 8/22/2001 12:00:00 AM | P | NR |
|
|
###-####
|