MEC02-01790
| Final | 8/21/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 11:18:37. Contact: ###-####. C/N--Complete and re-call-stove not in, dryer vent not finished, b-vent not installed, condesate in dirt, etc.--$42.00 re-inspect fee. 8/22/2002 9:56:26 AM
|
MEC02-01760
| Final | 8/21/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 12:03:25. Contact: ###-####. C/N--Register to be sealed above the floor--informed office via telephone. 8/22/2002 8:48:53 AM
|
MEC02-02288
| Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 13:59:31. Contact: ###-####.
|
MEC02-02288
| Pressure Test | 8/21/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 14:00:13. Contact: ###-####.
|
BLD02-01206
| BLD-Final | 8/21/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | A | PASS |
|
|
GARY; Phone #: ###-#### C. of C. #23311 issued. 8/22/2002 9:39:43 AM
|
BLD02-01944
| BLD-Footing | 8/22/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 07:02:59. Contact: ###-####. wip--35% ready 8/22/2002 11:13:27 AM
|
MEC02-01922
| Final | 8/22/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 08:10:16. Contact: ###-####.
|
BLD02-00855
| BLD-Framing/Rough-in | 8/22/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | P | PART |
|
|
SHEAR NAIL ###-#### Fireplace shear panel--ok to side. 8/22/2002 4:40:58 PM
|
BLD02-01282
| BLD-Wall cover | 8/22/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 09:02:04. Contact: ###-####. SHEAR--Ext. of house ok; detached garage light on staples (failed) interior OSB wall needs blocked and nails--check at frame. Interior stairs to upper section--top section under 36" in width. 8/22/2002 3:40:54 PM
|
MEC02-01790
| Final | 8/22/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 09:51:01. Contact: ###-####.
|
MEC02-02351
| Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-02351
| Pressure Test | 8/21/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-01780
| BLD-Framing/Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 12:00:00 AM | P | NR |
|
|
Phone #: ###-#### SHEAR--Decking not on roof, no osb on upstairs shear--complete and re-call--do not side. 8/22/2002 2:25:32 PM
|