PLM03-02450
| Final | 8/19/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/19/2003 at 3:38:30 PM. Contact: ###-####. final ok 8/22/2003 9:45:44 AM
|
PLM03-01755
| Final | 8/21/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | A | PASS |
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Annette Moore called in the wrong number 8/22/2003 10:36:25 AM
|
PLM03-02607
| Sprinkler (Final) | 8/21/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | A | PASS |
|
|
###-#### chad final ok 8/22/2003 9:57:17 AM
|
PLM03-02435
| Plumbing Rough-in | 8/21/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | A | PART |
|
|
FRANK YOUNG; Phone #: ###-#### Internet Inspection Request from: Pam Masselli above floor ri restrooms ok 8/22/2003 10:52:04 AM
|
PLM03-02587
| Sprinkler (Final) | 8/21/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | A | PASS |
|
|
final ok with test ports plugged 8/22/2003 11:39:30 AM
|
PLM03-00538
| Final | 8/21/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | A | PASS |
|
|
sw, rd final ok 8/22/2003 11:44:34 AM
|
PLM03-00397
| Final | 8/21/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | A | FAIL |
|
|
install funnells at floor drains by ice makers, air gap water to ice makers, room 336 incomplete, expose building drain c.o., calk sink in room 122, r.p. required on chemical feed at washer, calk 3 comp sink, install grates on all floor sinks, calk d.f. turn down t&p drain , h.b.v.b. required on boiler drain in pool equipment room, test r.p. in pool equipment room, remove sheetrock screws on c.o. covers, calk toilets in public restrooms. 8/22/2003 5:02:52 PM
|
PLM03-02064
| Final | 8/21/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 5:15:57 PM. Contact: ###-####. final ok 8/22/2003 10:36:04 AM
|
PLM03-00687
| Final | 8/22/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | P | PASS |
|
|
underground -mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final ok this is a final not an underground 8/22/2003 1:28:16 PM
|
PLM03-01653
| Final | 8/22/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/22/2003 at 8:52:27 AM. Contact: ###-####. final ok 8/22/2003 3:39:40 PM
|
PLM03-01898
| Final | 8/22/2003 | 8/22/2003 | 8/22/2003 12:00:00 AM | P | FAIL |
|
|
house ok needs sprinkler permit 8/22/2003 1:47:44 PM
|