ESC05-01108
| Random Inspection | 8/22/2005 | 8/22/2005 | 8/23/2005 7:27:05 AM | P | FAIL |
|
|
Contacted rp--Bare ground needs stablization meaures. Sediment barriers needed at misc. locations. Detention basins on downhill slopes needed to provide continency for rain events. Requested rp to review plan in regards for measures to prevent erosion/sediment problems and to call me back.
|
ESC04-00912
| BMP Violation | 8/19/2005 | 8/22/2005 | 8/22/2005 3:35:49 PM | P | PASS |
|
|
Follow up inspection. 3:00 a.m
|
ESC05-01284
| Site Preparation | 8/15/2005 | 8/22/2005 | 8/22/2005 1:20:44 PM | P | PART |
|
|
follow up
|
ESC05-01200
| Site Preparation | 8/22/2005 | 8/22/2005 | 8/22/2005 11:53:49 AM | A | FAIL |
|
|
C/Notice issued. RP listed on permit had not been on site occuring to site foreman. No signage or other indications that any esc controls are in place. Have rp with day to day control and sign posted by the end of the day of 8/23/05 or a stop work can be issued.
|
ESC05-01263
| Site Preparation | 8/22/2005 | 8/22/2005 | 8/22/2005 11:48:35 AM | A | PART |
|
|
T. Records had placed a stop work based on no erosion control measures being installed prior to earth disturbing activities. Partial placement of bmp's were being installed at time of inpsection.
|