FIR06-00559
| INSP-Sprinkler Rough-in/Hydro | 8/22/2006 | 8/22/2006 | 8/22/2006 3:52:07 PM | P | PASS |
|
|
Sprinkler piping is ok to cover
|
FIR06-00328
| INSP-Sprinkler Rough-in/Hydro | 8/21/2006 | 8/22/2006 | 8/22/2006 2:48:38 PM | P | PASS |
|
|
Sprinkler rough-in is passed. Piping in the office areas is ok to cover. Two esfr heads on the east side of the electrical room are overspaced. Earthquake bracing on the mains needs finished up. Above ground hydro test passed.
|
FIR06-00448
| INSP-Sprinkler Rough-in | 8/22/2006 | 8/22/2006 | 8/22/2006 2:45:41 PM | P | PASS |
|
|
All sprinkler piping in the open sales area is ok to cover. I spoke to an electrician about one exit sign theat was creating an obstruction to a pendnat head
|
MIS06-00132
| FIR-Final | 8/21/2006 | 8/22/2006 | 8/22/2006 12:02:10 PM | A | FAIL |
|
|
Indicator has not been installed at the main exit yet or the sticker.
|
FIR06-00446
| INSP-Final Inspection | 8/21/2006 | 8/22/2006 | 8/22/2006 10:54:42 AM | A | FAIL |
|
|
Can't give final until the ceiling tile has been installed. The ceiling transition from the hall to the open area needs a separation or upright protection will be required above the ceiling.
|
FIR05-00536
| INSP-Sprinkler Rough-in/Hydro | 8/21/2006 | 8/22/2006 | 8/22/2006 9:00:54 AM | A | PASS |
|
|
Sprinkler piping in the fire command center is ok to cover.
|
FIR05-00536
| INSP-Supply line flush | 8/21/2006 | 8/22/2006 | 8/22/2006 8:29:16 AM | A | PASS |
|
|
Underground flush passed.
|