Inspections for the day of: Wednesday, August 22, 2007.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-02712 Conference8/22/20078/22/20078/22/2007 4:14:11 PMPDONE
steve Phone #: ###-#### talked about copper pipe to be bonded, adding recpt in common area, ok to cover a little sheet rock for hvac to mount equip, no piping over panels
ELE07-02633 Electrical Rough-In8/22/20078/22/20078/22/2007 3:47:18 PMPPASS
larry - wet niche and grid Phone #: ###-#### wet niche and equi-pot plane ok
ELE07-02706 Permanent Service8/22/20078/22/20078/22/2007 3:27:41 PMPPASS
chris Phone #: ###-#### called, left message to move plant in front of service, p/s u/g n ok
ELE07-00769 Final8/22/20078/22/20078/22/2007 2:50:31 PMPPASS
Scheduled by a contractor via Hello! on 8/22/2007 at 8:01:00 AM. Contact: ###-####. ok to final, signed struct card
ELE07-00768 Final8/22/20078/22/20078/22/2007 2:27:57 PMPPASS
Scheduled by a contractor via Hello! on 8/22/2007 at 7:59:59 AM. Contact: ###-####. ok to final, signed struct card
ELE07-01657 Rough-In Permanent Service8/22/20078/22/20078/22/2007 1:47:17 PMPPASS
chris Phone #: ###-#### corr made, ric ok, p/s u/g n ok
ELE07-02930 Electrical Rough-In8/22/20078/22/20078/22/2007 1:17:05 PMPPASS
jim Phone #: ###-#### ric ok, called to check on bath recpt, left message, showed bldr
ELE07-02850 Electrical Rough-In8/22/20078/22/20078/22/2007 12:20:59 PMPPASS
francis Phone #: ###-#### call in advance jerod ###-#### ric ok 4 rooms
ELE07-02912 Permanent Service8/22/20078/22/20078/22/2007 11:34:26 AMAPASS
Aaron White Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer talked with contr, checked main service only, ipco had 2 red tags, for 201 & 202, rest of service had blue tags, told contr that he needs to verify that all power for house, 101 & 102 is satisfactory to him, and that on re-wire of rest he needs to call for ri and finals. p/s u/g rec ok
ELE07-02919 Final8/21/20078/22/20078/22/2007 10:30:02 AMACANC
Aaron White Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer see p/s comments ele07-02912
ELE07-02918 Final8/21/20078/22/20078/22/2007 10:28:37 AMACANC
Aaron White Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer see comments for ele07-02912 p/s
ELE07-02917 Final8/21/20078/22/20078/22/2007 10:27:25 AMACANC
Aaron White, unit # 102 Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer see p/s for ele07-02912
ELE07-02912 Final8/21/20078/22/20078/22/2007 10:26:17 AMACANC
Aaron White Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer see p/s
ELE07-00889 Final8/21/20078/22/20078/22/2007 9:06:38 AMAFAIL
randy Phone #: ###-#### called, left message,BCC- no structural card to sign nec 250.12 shall remove nonconductive coatings on equipment to be grounded- lite pole, 110.14(A) terminal connections shall be tight to ensure thorough connection- lite pole
ELE07-02914 Rough-In Permanent Service8/21/20078/22/20078/22/2007 8:19:05 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson ric ok, p/s u/g n ok