BLD07-01924
| BLD-Energy code compliance | 8/22/2007 | 8/22/2007 | 8/23/2007 7:44:23 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/22/2007 at 9:15:07 AM. Contact: ###-####. seal package ok ok to insulate
|
BLD07-00975
| BLD-Final | 8/22/2007 | 8/22/2007 | 8/23/2007 7:43:06 AM | P | CANC |
|
|
levco Phone #: ###-####Note:please 1/2 hr prior to inspection to make h/o is there
|
BLD07-00804
| BLD-Other | 8/21/2007 | 8/22/2007 | 8/23/2007 7:41:52 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/21/2007 at 11:02:26 AM. Contact: (208) ok to cover ceiling grid
|
BLD07-01971
| BLD-Footing | 8/21/2007 | 8/22/2007 | 8/22/2007 3:32:41 PM | P | PASS |
|
|
brian Phone #: ###-####
|
BLD07-01178
| BLD-Foundation | 8/21/2007 | 8/22/2007 | 8/22/2007 2:48:29 PM | P | PASS |
|
|
eric - wall Phone #: ###-####
|
BLD06-00075
| BLD-Framing/Rough-in | 8/21/2007 | 8/22/2007 | 8/22/2007 2:47:48 PM | A | FAIL |
|
|
mel Phone #: ###-#### needs seal package installed needs to fire stop party walls finish shear nailing and shaft
|
BLD06-00500
| BLD-Conference | 8/21/2007 | 8/22/2007 | 8/22/2007 10:05:28 AM | A | PASS |
|
|
scott Phone #: ###-####Note: please call 1/2 hr prior to conference
|
BLD07-01426
| BLD-Final | 8/21/2007 | 8/22/2007 | 8/22/2007 9:29:49 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/21/2007 at 8:55:05 AM. Contact: (208) ok for perm occ
|