ESC06-01911
| BMP Violation | 8/20/2007 | 8/22/2007 | 8/22/2007 3:57:03 PM | A | CANC |
|
|
|
ESC06-01517
| BMP Violation | 8/20/2007 | 8/22/2007 | 8/22/2007 3:56:51 PM | A | CANC |
|
|
|
ESC07-00702
| Conference | 8/22/2007 | 8/22/2007 | 8/22/2007 2:41:59 PM | P | PART |
|
|
Met with RP on site and ditch rider to discuss water schedule. Sediment barriers are being installed to prevent further issues on site. Will reinpsect site next week to ensure that bmp's are being maintained as necessary.
|
ESC07-00702
| BMP Violation | 8/22/2007 | 8/22/2007 | 8/22/2007 2:41:33 PM | P | PART |
|
|
Met with RP on site and ditch rider to discuss water schedule. Sediment barriers are being installed to prevent further issues on site. Will reinpsect site next week to ensure that bmp's are being maintained as necessary.
|
ESC06-01518
| Site Final | 8/22/2007 | 8/22/2007 | 8/22/2007 10:38:42 AM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC06-01310
| BMP Violation | 8/20/2007 | 8/22/2007 | 8/22/2007 10:24:00 AM | A | PART |
|
|
Met with RP to reinspect site. Issues on c/n have been addressed. Silt fence along Crescent Line will be removed when road work is completed this week. All other issues have been addressed.
|
ESC07-00702
| BMP Violation | 8/20/2007 | 8/22/2007 | 8/22/2007 9:59:58 AM | A | FAIL |
|
|
Sediment barriers are still not in place. Water in ditch is preventing sediment barriers from being installed. Contacted ditch rider about water schedule. Flood gate will be shut by noon today and water level will decrease enough for barriers to be installed.
|
ESC07-00117
| Complaint Inspection | 8/22/2007 | 8/22/2007 | 8/22/2007 9:31:22 AM | P | FAIL |
|
|
Notified RP of citizen complaint regarding dust. Forwarded complaint to DEQ as well. All other bmp's are being maintained.
|