Inspections for the day of: Friday, August 22, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00231 Random Inspection8/22/20088/22/20088/22/2008 5:22:45 PMPPASS
Robert Stanford
ESC08-00402 Site Preparation8/22/20088/22/20088/22/2008 3:58:19 PMPPASS
Tim Behrman
BLD08-01056 BLD-Other8/21/20088/22/20088/22/2008 3:06:28 PMAPASS
Rx grid inspection... Phone #: ###-#### Internet Inspection Request from: Nick Downing
ESC08-00406 Random Inspection8/22/20088/22/20088/22/2008 2:26:39 PMPPASS
BLD08-00234 BLD-Framing/Rough-in8/21/20088/22/20088/22/2008 2:26:23 PMPPART
Scheduled by a contractor via Hello! on 8/21/2008 at 5:14:27 PM. Contact: ###-####.
!st floor appears OK........Needs firestop on a few through electrical box penitrations at 1hr walls.
BLD08-00475 BLD-Foundation8/21/20088/22/20088/22/2008 11:30:48 AMAPART
Scheduled by a contractor via Hello! on 8/21/2008 at 1:15:28 PM. Contact: ###-####.
Tall interior shear walls OK pending STRATA special insp, tests and approvals.
BLD08-00975 BLD-Footing8/22/20088/22/20088/22/2008 11:27:31 AMAPASS
Scheduled by a contractor via Hello! on 8/22/2008 at 7:17:24 AM. Contact: ###-####.
BLD08-00979 BLD-Footing8/22/20088/22/20088/22/2008 11:27:14 AMAPASS
Scheduled by a contractor via Hello! on 8/22/2008 at 7:16:01 AM. Contact: ###-####.
BLD07-02290 BLD-Conference8/21/20088/22/20088/22/2008 11:26:51 AMADONE
joe Phone #: ###-####
BLD08-00606 BLD-Energy code compliance8/21/20088/22/20088/22/2008 10:26:50 AMAPASS
Rob Phone #: ###-####