ESC08-00231
| Random Inspection | 8/22/2008 | 8/22/2008 | 8/22/2008 5:22:45 PM | P | PASS |
|
|
Robert Stanford
|
ESC08-00402
| Site Preparation | 8/22/2008 | 8/22/2008 | 8/22/2008 3:58:19 PM | P | PASS |
|
|
Tim Behrman
|
BLD08-01056
| BLD-Other | 8/21/2008 | 8/22/2008 | 8/22/2008 3:06:28 PM | A | PASS |
|
|
Rx grid inspection... Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
ESC08-00406
| Random Inspection | 8/22/2008 | 8/22/2008 | 8/22/2008 2:26:39 PM | P | PASS |
|
|
|
BLD08-00234
| BLD-Framing/Rough-in | 8/21/2008 | 8/22/2008 | 8/22/2008 2:26:23 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/21/2008 at 5:14:27 PM. Contact: ###-####. !st floor appears OK........Needs firestop on a few through electrical box penitrations at 1hr walls.
|
BLD08-00475
| BLD-Foundation | 8/21/2008 | 8/22/2008 | 8/22/2008 11:30:48 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/21/2008 at 1:15:28 PM. Contact: ###-####. Tall interior shear walls OK pending STRATA special insp, tests and approvals.
|
BLD08-00975
| BLD-Footing | 8/22/2008 | 8/22/2008 | 8/22/2008 11:27:31 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/22/2008 at 7:17:24 AM. Contact: ###-####.
|
BLD08-00979
| BLD-Footing | 8/22/2008 | 8/22/2008 | 8/22/2008 11:27:14 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/22/2008 at 7:16:01 AM. Contact: ###-####.
|
BLD07-02290
| BLD-Conference | 8/21/2008 | 8/22/2008 | 8/22/2008 11:26:51 AM | A | DONE |
|
|
joe Phone #: ###-####
|
BLD08-00606
| BLD-Energy code compliance | 8/21/2008 | 8/22/2008 | 8/22/2008 10:26:50 AM | A | PASS |
|
|
Rob Phone #: ###-####
|