FIR08-00361
| INSP-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 4:50:19 PM | A | FAIL |
|
|
Need to provide inspectors test connections per NFPA 13D 2007 7.2.4 and 7.2.5.
|
BLD07-03282
| FIRE-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 4:42:46 PM | A | NR |
|
|
Fire lane signage has been provided, final pending project related fire sprinkler permit work.
|
BLD08-01251
| FIRE-Final Inspection | 8/22/2008 | 8/22/2008 | 8/22/2008 4:38:10 PM | P | PASS |
|
|
Fire life safety passed, no inspection card available on site for signature.
|
BLD08-00956
| FIRE-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 3:42:01 PM | P | PASS |
|
|
Corrections finished, fire life safety passed.
|
FIR08-00417
| INSP-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 3:40:54 PM | P | PASS |
|
|
Drop ceilings installed, fire sprinkler permit finaled.
|
BLD08-00755
| FIRE-Final Inspection | 8/22/2008 | 8/22/2008 | 8/22/2008 2:25:30 PM | P | PART |
|
|
EM lights, exit signs tested okay, missing building fire alarm interconnection and testing-see fire code review notes for details (permit req.), remainder of life safety items okayed, TOC approval per M. Sentenno under condition of fire watch as agreed.
|
BLD08-01094
| FIRE-Final Inspection | 8/22/2008 | 8/22/2008 | 8/22/2008 2:18:09 PM | P | NR |
|
|
Missing project related fire sprinkler permit final.
|
FIR08-00570
| INSP-Sprinkler Rough-in/Hydro | 8/21/2008 | 8/22/2008 | 8/22/2008 2:11:17 PM | P | PART |
|
|
OH rough-in at the remodeled conference and office space areas are good for cover at the drop ceilings.
|
BLD08-00955
| FIRE-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 2:09:24 PM | P | PASS |
|
|
Corrections verified for compliance, fire life safety passed.
|
BLD08-00755
| FIRE-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 12:27:19 PM | A | PART |
|
|
tom - fire life safety Phone #: ###-#### NOTE by S. Rogers. There is no FA permit for this structure; an application was not submittted due to lack of programming information. The main school FACP is out of service and awaiting parts for repair, scheduled for next Tuesday. Meantime the FD (Mark Senteno) has approved a fire watch system in lieu of fire alarm coverage for the main building and the detached portable buildings to be occupied for school occupancy starting Monday 8/25/08. The custodians have been instructed to make at least hourly rounds through all areas of the building on a 24/7 basis, with records of rounds kept; the school administration will use the PA system for notification in the event of a fire emergency, following existing emergency notification procedures. Parts are expected to be installed and the FACP and main building alarm system back in service by Tuesday, 8/27/08. Alarm service for this portable builidng should be provided at the same time or the 24/7 watch service continued for it.
|
FIR08-00480
| INSP-Sprinkler Rough-in | 8/21/2008 | 8/22/2008 | 8/22/2008 11:55:21 AM | A | PART |
|
|
Plan resubmittals accepted regarding field modifications, tenting appears acceptable, noted corrections verified, overhead install is okay for cover.
|
FIR08-00302
| INSP-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 11:16:14 AM | A | PASS |
|
|
Noted corrections are complete, plans verified, fire sprinkler permit finaled.
|
BLD08-01094
| FIRE-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 10:06:24 AM | A | FAIL |
|
|
The project related fire sprinkler permit work is not finished, remainder of fire life safety is acceptable.
|
FIR08-00498
| INSP-Final Inspection | 8/21/2008 | 8/22/2008 | 8/22/2008 10:03:34 AM | A | FAIL |
|
|
The four additional heads added per plan modification are not installed-need to provide drop ceiling and pendents per plan or upright sprinklers to maintain coverage throughout.
|