BLD11-00669
| FIRE-Final Inspection | 8/19/2011 | 8/22/2011 | 8/23/2011 7:55:39 AM | A | NR |
|
|
Chris Jackson Phone #: ###-####
|
FIR11-00098
| INSP-Final Inspection | 8/19/2011 | 8/22/2011 | 8/22/2011 4:28:55 PM | P | PASS |
|
|
Site testing and inspection completed acceptable. Permit finaled.
|
FIR08-00239
| INSP-Sprinkler Rough-in | 8/22/2011 | 8/22/2011 | 8/22/2011 4:26:30 PM | P | PART |
|
|
Begin 24 hr. air test of the new dry systems at all floor levels for both buildings #2 and 3 @3:00PM.
|
BLD11-00690
| FIRE-Final Inspection | 8/22/2011 | 8/22/2011 | 8/22/2011 4:23:33 PM | P | PASS |
|
|
Life safety inspection passed with the exception of missing address numbers- to be posted prior to structural final inspection as agreed.
|
FIR11-00412
| INSP-Sprinkler Rough-in | 8/22/2011 | 8/22/2011 | 8/22/2011 4:21:30 PM | P | PART |
|
|
Overhead rough-in okayed for cover.
|
FIR11-00387
| INSP-Sprinkler Rough-in | 8/19/2011 | 8/22/2011 | 8/22/2011 4:18:25 PM | A | PART |
|
|
Overhead fire sprinkler modifications at the drop ceilings are approved for cover. One exit sign to be relocated due to obstruction to sprinkler coverage.
|
BLD11-00573
| FIRE-Final Inspection | 8/19/2011 | 8/22/2011 | 8/22/2011 4:14:30 PM | A | PASS |
|
|
Fire life safety passed.
|