Inspections for the day of: Saturday, August 22, 2015.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorThomas Walsh
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-02511 FIRE-Final Inspection8/22/20158/22/20158/22/2015 11:34:50 AMAPART
Fire life-safety inspection for new charter school. Many EM lights not operating, including all exit discharge lights. Contractor should check the plans for all indicated EM lights and repair/replace as needed. Fire extinguishers are OK, EVAC plans are not posted. There should be a ceiling in the main electrical room (pendant sprinkler). Exit door hardware looks OK, however there is a gate panic pad that needs to be repaired to make it easier to open the gate. The Fire Dept. should be requested to come out and confirm that the keys in the Knox Box will open up the main entry door. Fire alarm system testing is completed, however off site monitoring is nat active yet, since there is work going on the building that will produce dust, thus causing unwanted alarms. Fire alarm monitoring wil be confirmed at final inspection.
Final fire life-safety inspection will be required prior to occupancy. Please schedule a fina lfir inspection when all the discrepancies above have been corrected.
FIR15-00503 INSP-Sprinkler Rough-in/Hydro8/22/20158/22/20158/22/2015 11:25:18 AMPPASS
Hydrotest of FS U/G supply line from city connection to A/S BOR - 200 psi @ hours - PASSED. Waterflow device tested OK
Contractor still in process of sheet rocking areas where sprinklers protrude through ceiling. Also need to install ceiling in electrical closet. Need to install 4-way siesmic brace at top of riser.
Will inspect these discrepancies at final inspection.