FIR14-00205
| INSP-Sprinkler Rough-in/Hydro | 8/22/2017 | 8/22/2017 | 8/23/2017 12:29:33 PM | P | CANC |
|
|
Needing an UG Hydro done. Please call Scott Powada 30mins before inspection Phone #: ###-#### Inspection requested via web by Kylee Wilson
|
FIR17-00412
| INSP-Sprinkler Rough-in | 8/22/2017 | 8/22/2017 | 8/22/2017 3:01:19 PM | P | PASS |
|
|
Underground rough to cover passed. Piping can be buried.
|
BLD17-01329
| FIRE-Final Inspection | 8/22/2017 | 8/22/2017 | 8/22/2017 1:27:15 PM | P | CANC |
|
|
Jeff Phone #: ###-####
|
NAF17-00054
| INSP-Final | 8/21/2017 | 8/22/2017 | 8/22/2017 1:27:04 PM | P | FAIL |
|
|
Provide a fire extinguisher as discussed for the second level.
|
FIR17-00277
| INSP-Final Inspection | 8/21/2017 | 8/22/2017 | 8/22/2017 12:38:13 PM | A | FAIL |
|
|
Notification needs to be modified in the new corridor system as discussed. No testing performed.
|
BLD13-02973
| FIRE-Final Inspection | 8/21/2017 | 8/22/2017 | 8/22/2017 11:53:39 AM | A | FAIL |
|
|
I only had time for a quick curtesy walk through today. Need the project related fire alarm and fire sprinkler permits finaled. Need ADA compliant hardware for all new doors, plans need to be re-submitted showing the three exteriro doors deleted with their associated exit signs and discharge lights, missing exit signs in Santuary, non-functional sings in Lobby and Santuary, need code compliant hood and suppression system for the type 1 hood in the Kitchen as noted on the approved drawings, missing electric alarm sprinkler bell, missing exit signs in the existing Classroom portion of building as shown on the plans. ....ect. No fire dept review notes on site.
Jessie Phone #: ###-####
|
FIR14-00205
| INSP-Alarm Testing | 8/21/2017 | 8/22/2017 | 8/22/2017 11:47:34 AM | A | FAIL |
|
|
I could not find a record of an undergrond hydro, missing two sprinkler canopies. in the east stairwell, need the pressure relief valve setup, need backflow certified, need head box signs and calc sticker, need three pendants removed where ceilings have not been installed. Leak is fixed.
|
FIR14-00701
| INSP-Final Inspection | 8/18/2017 | 8/22/2017 | 8/22/2017 11:44:05 AM | P | FAIL |
|
|
Need as-builts addressing the device locations and candella changes, hvac unit needs wired for shutdown, need map, need notification in short corridor, need flow switch tested.. All other devices tested
|
FIR17-00369
| INSP-Final Inspection | 8/21/2017 | 8/22/2017 | 8/22/2017 8:18:39 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
John Phone #: ###-####
|
NAF17-00041
| INSP-Sprinkler Rough-in/Hydro | 8/18/2017 | 8/22/2017 | 8/22/2017 7:00:42 AM | A | PASS |
|
|
24 hour are test passed for the new addition
|
NAF16-00019
| INSP-Final | 8/22/2017 | 8/22/2017 | 8/22/2017 12:00:00 AM | A | PASS |
|
|
Rough in and flush and hydro were all complete there was never a final called in Phone #: ###-#### >> Inspection requested via web by Sam Ball
|