BLD17-01173
| BLD-Footing | 8/21/2017 | 8/22/2017 | 8/22/2017 4:09:02 PM | P | PART |
|
|
Mark Phone #: ###-####. Work in progress on remainder of loading dock footings. Will have special inspection.
|
BLD17-02443
| BLD-Footing | 8/21/2017 | 8/22/2017 | 8/22/2017 2:54:43 PM | P | PASS |
|
|
Rebar - Ryan Phone #: ###-####
|
BLD17-02325
| BLD-Final | 8/21/2017 | 8/22/2017 | 8/22/2017 2:25:54 PM | P | DONE |
|
|
Inspection requested via web by Angela Hadley
|
BLD17-02325
| DOC - Permit Finaled | 8/22/2017 | 8/22/2017 | 8/22/2017 2:25:43 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD16-03770
| BLD-Final | 8/22/2017 | 8/22/2017 | 8/22/2017 2:11:36 PM | P | FAIL |
|
|
Joe Phone #: ###-####. Provide blower door test results and post, or the 3rd. party airseal inspection report. Correction notice posted.
|
BLD17-02181
| BLD-Wall Bracing | 8/22/2017 | 8/22/2017 | 8/22/2017 1:37:27 PM | P | PASS |
|
|
Shear // Zane Phone #: ###-####
|
MIS17-00248
| BLD-Conference | 8/14/2017 | 8/22/2017 | 8/22/2017 10:36:08 AM | A | DONE |
|
|
Check on status. Per owners, they have met ith briggs engineering and Sundell architecture as of yesterday.
|
BLD17-02634
| BLD-Other | 8/21/2017 | 8/22/2017 | 8/22/2017 8:44:36 AM | A | PASS |
|
|
Ashleigh-block and tie Phone #: ###-####. Block and tie ok.
|
BLD16-04511
| BLD-Foundation | 8/22/2017 | 8/22/2017 | 8/22/2017 12:00:00 AM | A | NR |
|
|
Sam ###-####
|