BLD18-01840
| BLD-Footing | 8/22/2018 | 8/22/2018 | 8/22/2018 4:13:32 PM | P | NR |
|
|
Pat Phone #: ###-#### lot flooded need compaction report
|
BLD18-01660
| BLD-Footing | 8/22/2018 | 8/22/2018 | 8/22/2018 4:13:13 PM | P | NR |
|
|
Pat Phone #: ###-#### lot flooded need compaction report
|
BLD18-02282
| BLD-Footing | 8/22/2018 | 8/22/2018 | 8/22/2018 4:12:11 PM | P | PASS |
|
|
pat Phone #: ###-####
|
BLD18-03021
| BLD-Conference | 8/22/2018 | 8/22/2018 | 8/22/2018 4:11:56 PM | P | PASS |
|
|
Footing is dug and form in place pending your review before pouring concrete Phone #: ###-#### Inspection requested via web by Edgar Dodge
|
BLD18-02225
| BLD-Wall Bracing | 8/22/2018 | 8/22/2018 | 8/22/2018 3:09:42 PM | P | PASS |
|
|
Inspection requested via web by Marc Foote
|
BLD18-02223
| BLD-Footing | 8/22/2018 | 8/22/2018 | 8/22/2018 2:54:43 PM | P | PASS |
|
|
Jared Phone #: ###-####
|
BLD18-02319
| BLD-Framing/Rough-in | 8/20/2018 | 8/22/2018 | 8/22/2018 2:27:54 PM | P | FAIL |
|
|
Todd Phone #: ###-#### c/n
|
MIS17-00271
| MIS-Aging Inspection | 8/22/2018 | 8/22/2018 | 8/22/2018 1:23:44 PM | | FAIL |
|
|
Routing Walk-In (Zoning) 9/19/2017 9/19/2017 9/19/2017 P FAIL DetailsKatelyn Menuge Structure not permitted in rear setback. Application received 9/19/2017
|
BLD18-02284
| BLD-Final | 8/17/2018 | 8/22/2018 | 8/22/2018 1:17:32 PM | A | PASS |
|
|
Jay Karel Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD18-02284
| DOC - Permit Finaled | 8/22/2018 | 8/22/2018 | 8/22/2018 1:17:15 PM | P | PASS |
|
|
|
BLD18-02232
| BLD-Wall Bracing | 8/21/2018 | 8/22/2018 | 8/22/2018 1:16:53 PM | A | PART |
|
|
Adam Phone #: ###-#### exterior ok
|
BLD18-02856
| BLD-Footing | 8/20/2018 | 8/22/2018 | 8/22/2018 9:26:17 AM | A | PASS |
|
|
Chris Phone #: ###-####
|