Inspections for the day of: Wednesday, August 23, 1995.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC3047793 INSP - Final8/23/19958/23/19958/23/1995 12:00:00 AM FAIL
/ / 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need to wrap metal in crawl
MEC95-00362 INSP - Final8/23/19958/23/19958/23/1995 12:00:00 AM PASS
/ / 350 - FNL -OK FINAL
MEC95-00362 INSP - Final8/23/19958/23/19958/23/1995 12:00:00 AM PASS
/ / 350 - FNL -OK FINAL
MEC95-00620 INSP - Gas pressure test8/23/19958/23/19958/23/1995 12:00:00 AM PASS
/ / 350 - GP -OK GAS PIPING #27940
MEC95-00620 INSP - Gas pressure test8/23/19958/23/19958/23/1995 12:00:00 AM PASS
/ / 350 - GP -OK GAS PIPING #27940
MEC95-00641 INSP - Framing/ Rough-in8/23/19958/23/19958/23/1995 12:00:00 AM PASS
/ / 350 - RGHN-OK ROUGH IN
MEC95-00641 INSP - Framing/ Rough-in8/23/19958/23/19958/23/1995 12:00:00 AM PASS
/ / 350 - RGHN-OK ROUGH IN
MEC95-00642 INSP - Gas log/ Fireplace8/23/19958/23/19958/23/1995 12:00:00 AM PASS
/ / 350 - f/p ok
MEC95-00639 INSP - Framing/ Rough-in8/22/19958/23/19958/23/1995 12:00:00 AMAPASS
08/22/95 350 - RGHN-OK ROUGH IN need to seal exhaust duct with foil tape
MEC95-00639 INSP - Gas pressure test8/22/19958/23/19958/23/1995 12:00:00 AMAPASS
08/22/95 350 - GP -OK GAS PIPING #27942
MEC95-00640 INSP - Framing/ Rough-in8/22/19958/23/19958/23/1995 12:00:00 AMAPASS
08/22/95 350 - RGHN-OK ROUGH IN
MEC95-00640 INSP - Gas pressure test8/22/19958/23/19958/23/1995 12:00:00 AMAPASS
08/22/95 350 - GP -OK GAS PIPING #27943
MEC95-00423 INSP - Gas pressure test8/22/19958/23/19958/23/1995 12:00:00 AMAPASS
08/22/95 350 - GP -OK GAS PIPING #27947
MEC95-00620 INSP - Framing/ Rough-in8/22/19958/23/19958/23/1995 12:00:00 AMAPASS
08/22/95 350 - REINSPECT RGHN-OK ROUGH IN
MEC95-00092 INSP - Final8/23/19958/23/19958/23/1995 12:00:00 AMPPASS
08/23/95 350 - READY AT 4:00 FNL -OK FINAL ì
MEC95-00092 INSP - Final8/23/19958/23/19958/23/1995 12:00:00 AMPPASS
08/23/95 350 - READY AT 4:00 FNL -OK FINAL ì
MEC95-00326 INSP - Final8/23/19958/23/19958/23/1995 12:00:00 AMPFAIL
08/23/95 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need protection post in garag
MEC95-00326 INSP - Final8/23/19958/23/19958/23/1995 12:00:00 AMPFAIL
08/23/95 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need protection post in garag
MEC95-00644 INSP - Gas pressure test8/23/19958/23/19958/23/1995 12:00:00 AMPFAIL
08/23/95 350 - pressure test failed pressure down
MEC3047737 INSP - Final8/23/19958/23/19958/23/1995 12:00:00 AMPFAIL
08/23/95 350 - no final cabinets to the side of gas range are to close n check on hvac in am
MEC3047737 INSP - Final8/23/19958/23/19958/23/1995 12:00:00 AMPFAIL
08/23/95 350 - no final cabinets to the side of gas range are to close n check on hvac in am