BLD00-01087
| FIRE-Final Inspection | 8/21/2000 | 8/23/2000 | 8/23/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 09:48:07. Contact: ###-####.
|
BLD00-00899
| FIRE-Final Inspection | 8/21/2000 | 8/23/2000 | 8/23/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 09:50:01. Contact: ###-####.
|
FIR00-00393
| INSP-Final Inspection | 8/23/2000 | 8/23/2000 | 8/23/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 8/23/2000
|
BLD00-02195
| FIRE-Conference | 8/23/2000 | 8/23/2000 | 8/23/2000 12:00:00 AM | P | PART |
|
|
FOR CONF-- MARK ARMSTRONG-- ###-#### told Mark to talk to the structural inspector about the 1 hour corridor wall construction; must have S rating on doors to corridor 8/23/2000 4:08:17 PM
|