BLD00-02594
| BLD-Framing/Rough-in | 8/22/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | A | FAIL |
|
|
###-####
c/n posted, conference on whole project w/ owners,,,partial inspection only 8/23/2001 2:55:01 PM
|
BLD01-00245
| BLD-Final | 8/22/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | A | PART |
|
|
###-#### call first to meet there
just need to finish final grade and hard surface parking per p/z 8/23/2001 11:15:00 AM
|
BLD01-01014
| BLD-Other | 8/22/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 15:50:47. Contact: ###-####.grout, allready done, pending si report 8/23/2001 10:28:36 AM
|
BLD01-01334
| BLD-Final | 8/22/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 18:26:24. Contact: ###-####.
they will reschedule 8/23/2001 12:03:22 PM
|
BLD00-01492
| BLD-Footing | 8/23/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | P | PART |
|
|
chris ###-#### ft insp
interior ftg., ok w/ verbal corrections 8/23/2001 3:05:23 PM
|
BLD00-03185
| BLD-Other | 8/23/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/23/2001 at 07:59:32. Contact: ###-####.final,, ok for temp. occ. 8/24/2001 8:23:27 AM
|
BLD01-01146
| BLD-Framing/Rough-in | 8/23/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | P | PART |
|
|
###-#### ###-#### buster
c/n posted on ext. shear 8/23/2001 4:24:47 PM
|
MEC01-02521
| Final | 8/23/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | P | PART |
|
|
###-#### jim call jim at work first to meet you there , gas test to a range.
///gas test passes, range hood not in yet 8/23/2001 3:18:42 PM
|
BLD01-01990
| BLD-Concrete | 8/23/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | P | NR |
|
|
###-#### clay
|
BLD01-01921
| BLD-Framing/Rough-in | 8/22/2001 | 8/23/2001 | 8/23/2001 12:00:00 AM | P | NR |
|
|
Drew ###-#### please call first---CANCEL PER DREW/MLS
|