PLM02-02548
| Water and/or Sewer | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | PASS |
|
|
###-#### SEWER
|
PLM02-02548
| Water and/or Sewer | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | CANC |
|
|
|
PLM02-02068
| Med/Gas Systems | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 15:01:33. Contact: ###-####. wed gas tests ok needs hangers on the vacuum in the crawlspace. 8/23/2002 10:57:34 AM
|
PLM02-02422
| Plumbing Rough-in | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | PASS |
|
|
KIRK OR ###-####; Phone #: ###-####
|
PLM02-01197
| Final | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-02611
| Water and/or Sewer | 8/23/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PASS |
|
|
###-#### steve
|
PLM02-02612
| Water and/or Sewer | 8/23/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | FAIL |
|
|
DEL ###-#### BILL INSPECTION IS FOR HOOK UP TO MOBILE HOME THAT HAS HAD THE SEWER /WATER LINES ALREADY RAN TO IT... LEE SAID THAT HE WOULD TELL YOU ABOUT IT ...DARLA 8/23/2002 3:03:10 PM leak on the 90 at the sever stub connection. 8/23/2002 3:04:21 PM
|
PLM02-02615
| Plumbing Rough-in | 8/23/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PASS |
|
|
###-#### JOE
|
PLM02-02587
| Final | 8/23/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PASS |
|
|
###-#### EDDIE
|
PLM02-00906
| Storm Drains | 8/23/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/23/2002 at 10:09:40. Contact: ###-####. 3RD N.E. ROTRENDRA test ok 8/23/2002 1:57:48 PM
|
PLM02-02539
| Other | 8/23/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PART |
|
|
conference on clawfoot tub valve cross connection control requirements
|