Inspections for the day of: Friday, August 23, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-02361 Final8/22/20028/23/20028/23/2002 12:00:00 AMAFAIL
###-####\\gas water heater need upper comb air and weather stripping around door 8/23/2002 10:21:10 AM
MEC02-02360 Rough-in8/22/20028/23/20028/23/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/22/2002 at 13:26:35. Contact: ###-####.
MEC02-02250 Rough-in8/22/20028/23/20028/23/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/22/2002 at 15:21:02. Contact: ###-####.
MEC02-01665 Final8/22/20028/23/20028/23/2002 12:00:00 AMAPART
temp occ. Dixie Fire Marshal will be there in a.m. will "pass" mau's inspect just before noon please??? Thanks; Phone #: ###-#### Internet Inspection Request from: Amanda Van Paepeghem temp ok..waiting on controller for mau on roof..must be done by oct 1st per fire dept 8/23/2002 11:08:18 AM
MEC02-00525 Final8/22/20028/23/20028/23/2002 12:00:00 AMAPASS
RUDY; Phone #: ###-####
MEC02-01686 Final8/22/20028/23/20028/23/2002 12:00:00 AMAPASS
RUDY; Phone #: ###-####
MEC02-02299 Final8/22/20028/23/20028/23/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/22/2002 at 17:21:37. Contact: ###-####....###-#### curt 8/23/2002 10:46:09 AM NEED LADDER FOR ROOF ACCESS
8/23/2002 1:59:29 PM
MEC02-02335 Rough-in8/22/20028/23/20028/23/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 08/22/2002 at 17:27:39. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/23/2002 at 09:56:15.
MEC02-02368 Rough-in8/23/20028/23/20028/23/2002 12:00:00 AMPFAIL
###-#### POSTED CORRECTIONS 8/23/2002 4:18:41 PM
MEC02-02368 Pressure Test8/23/20028/23/20028/23/2002 12:00:00 AMPFAIL
MEC02-02370 Final8/23/20028/23/20028/23/2002 12:00:00 AMPFAIL
###-#### STOP WORK..REMODELED WITHOUT A PERMIT 8/23/2002 5:38:16 PM
MEC02-02370 Pressure Test8/23/20028/23/20028/23/2002 12:00:00 AMPFAIL
MEC02-02083 Final8/23/20028/23/20028/23/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/23/2002 at 08:34:46. Contact: ###-####.... 8/23/2002 12:49:52 PM NEED FRESH AIR AT RTU 8/23/2002 2:57:36 PM
MEC02-02222 Pressure Test8/23/20028/23/20028/23/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/23/2002 at 10:37:06. Contact: ###-####.