BLD02-00850
| BLD-Framing/Rough-in | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-00122
| BLD-Final | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | PART |
|
|
###-####
ok for c of c after hillside is signed off 8/28/2002 3:08:09 PM
|
MEC02-02352
| Pressure Test | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | PASS |
|
|
MR & MRS LANE ###-####
range ok also 8/23/2002 9:49:27 AM
|
BLD02-01116
| BLD-Framing/Rough-in | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | PART |
|
|
JOCK; Phone #: ###-####
c/n posted, ok to insulate 8/23/2002 3:04:11 PM
|
BLD01-01992
| BLD-Conference | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | A | PASS |
|
|
###-#### TERRY PLEASE CALL 1ST
head room above winder stairs should finish out ok w/ 1/2" sheetrock. to get 6' 8" 8/23/2002 12:29:31 PM
|
BLD02-01558
| BLD-Energy code compliance | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PASS |
|
|
###-#### TODD
|
BLD02-01194
| BLD-Final | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PASS |
|
|
TODD ###-####
c of c issued 8/23/2002 10:59:43 AM
|
BLD01-02565
| BLD-Final | 8/22/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 23:09:20. Contact: ###-####.need trades 8/26/2002 9:55:12 AM
|
BLD02-01320
| BLD-Foundation | 8/23/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/23/2002 at 10:00:38. Contact: ###-####.
|
BLD02-01116
| BLD-Framing/Rough-in | 8/23/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PART |
|
|
jock ###-####
|
BLD01-01992
| BLD-Conference | 8/23/2002 | 8/23/2002 | 8/23/2002 12:00:00 AM | P | PASS |
|
|
see other notes 8/23/2002 4:02:20 PM
|