FIR04-00236
| INSP-Sprinkler Rough-in | 8/19/2004 | 8/23/2004 | 8/23/2004 12:00:00 AM | A | CANC |
|
|
Contact: Nate; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|
FIR04-00236
| INSP-Sprinkler Rough-in/Hydro | 8/20/2004 | 8/23/2004 | 8/23/2004 12:00:00 AM | A | PART |
|
|
Provide sprinklers or insulation in the west overbuild side pockets. Provide missing earthquake bracing and sprig-up as marked on plans. Provide verification that sidesammys will work in 2 x 4's. 8/23/2004 2:09:15 PM
|
FIR04-00434
| INSP-Sprinkler Rough-in/Hydro | 8/20/2004 | 8/23/2004 | 8/23/2004 12:00:00 AM | P | FAIL |
|
|
Wrong sprinkler heads have been installed. Change out heads or resubmit. Hydro test and rough-in OK. Need alarms 8/23/2004 3:00:02 PM
|
BLD04-01672
| FIRE-Final Inspection | 8/23/2004 | 8/23/2004 | 8/23/2004 12:00:00 AM | P | FAIL |
|
|
Sprinkler pendants in backroom are overspaced and spaced too close in one spot. Sprinkler work will require permits. Provide approved door hardware on all doors per review note #22. Must unlock in a single motion. Remove deadbolt on the rear door. Building floor plans do not match what is installed. Resubmit plans, 2 copies, to city of boise. Reviewer is Dan Stuart, ###-####. Remove plastic exit signs. Provide verification HVAC unit has duct smoke detector per fire review note #35 and test 8/23/2004 4:19:12 PM
|
BLD04-01104
| FIRE-Final Inspection | 8/23/2004 | 8/23/2004 | 8/23/2004 12:00:00 AM | P | CANC |
|
|
Contractor has not fixed strobe problem yet 8/23/2004 2:57:02 PM
|