Inspections for the day of: Thursday, August 23, 2007.
Number of inspections: 20
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-02347 Extend Permit 180 days8/20/20078/20/2007 P 
FIR07-00166 INSP-Alarm Testing8/22/20078/23/20078/23/2007 5:00:24 PMAFAIL
Overspaced SD at the cafeteria, strobe coverage is lacking at one area in the kitchen, audibility is too low for the kitchen service/prep area, remainder of the 4th floor west half as tested is acceptable.
BLD07-01043 FIRE-Final Inspection8/23/20078/23/20078/23/2007 3:35:26 PMPFAIL
Pending project related fire sprinkler permit final.
FIR07-00474 INSP-Final Inspection8/23/20078/23/20078/23/2007 3:34:00 PMPFAIL
Work is not complete.
FIR07-00620 INSP-Sprinkler Rough-in8/22/20078/23/20078/23/2007 3:14:35 PMAFAIL
See approved plans for areas inspected and noted defficiences including overspaced heads at an office and equip. room, missing hangers at two arm-overs, and missing heads at three closets.
BLD07-01658 FIRE-Final Inspection8/23/20078/23/20078/23/2007 2:36:05 PMPPASS
Fire life safety inspection passed.
FIR07-00233 INSP-Sprinkler Rough-in8/22/20078/23/20078/23/2007 2:12:34 PMAPART
UG fire supply line from the stub in at the foundation to the PIV only is okay for cover. Also inspected UG fire supply lines for the other three buildings not separately requested for inspection under respective FIR #'s as will be required for hydrostatic and flushing inspections.
FIR07-00460 INSP-Final Inspection8/23/20078/23/20078/23/2007 1:53:58 PMPCANC
No time available to complete this inspection today, to be rescheduled.
BLD07-00292 FIRE-Final Inspection8/23/20078/23/20078/23/2007 1:52:48 PMPNR
Intended for an on site conference, to be scheduled as discussed.
BLD07-00623 FIRE-Alarm Testing8/22/20078/23/20078/23/2007 1:42:09 PMAPASS
Request intended for fire life safety final. Fire life safety is acceptable, need to install smoke seal at the door prior to structural final-to be completed when door frame paint is finished per contractor.
BLD07-01679 FIRE-Final Inspection8/23/20078/23/20078/23/2007 12:48:57 PMPPASS
Life safety inspection passed.
BLD07-00808 FIRE-Final Inspection8/22/20078/23/20078/23/2007 11:57:28 AMAPASS
Fire life safety is acceptable pending the addition of two PFE's on the mezzanine level, also need to blank keyed locks above the panic hardware, these two items shall be completed prior to structural final-verified at that time.
FIR07-00141 INSP-Final Inspection8/22/20078/23/20078/23/2007 11:17:11 AMAPART
Overhead rough in is good for cover at the hard lid ceiling areas, changes to floor plan are noted.
FIR07-00142 INSP-Final Inspection8/22/20078/23/20078/23/2007 11:15:54 AMAPART
OH install is approved for cover at the hard lid ceilings, floor plan changes noted.
FIR07-00149 INSP-Final Inspection8/22/20078/23/20078/23/2007 11:14:52 AMAPART
OH install is approved for cover, noted some changes to floor plan are acceptable.
FIR07-00145 INSP-Final Inspection8/22/20078/23/20078/23/2007 11:13:05 AMAFAIL
Missing sprinkler protection at one closet which exceeds dimentions allowed for coverage omission, remainder of ceilings are okay for cover.
FIR07-00150 INSP-Final Inspection8/22/20078/23/20078/23/2007 11:09:07 AMAFAIL
One head is blocked by ductwork at a mech. closet, pendent at the kitchen area must meet obstruction tables for proximity to an adjacent soffit, remainder of ceilings are okay for cover.
FIR06-00007 INSP-Final Inspection8/21/20078/23/20078/23/2007 10:07:21 AMACANC
No time available to complete this inspection today, rescheduled for 8/24 AM as agreed.
BLD06-03408 FIRE-Final Inspection8/22/20078/23/20078/23/2007 10:05:38 AMAPASS
Corrections are complete, fire life safety inspection passed.
FIR07-00029 FIR-Aging Inspection8/23/20078/23/20078/23/2007 9:47:24 AM DEFR
Work in progress.