Inspections for the day of: Monday, August 23, 2010.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00721 INSP-Final Inspection8/23/20108/23/20108/24/2010 4:29:16 PMPPASS
Fire sprinkler permit finaled.
BLD10-01906 FIRE-Final Inspection8/20/20108/23/20108/24/2010 2:38:17 PMPFAIL
See activity notes dated 8/24.
FIR10-00054 INSP-Sprinkler Rough-in/Hydro8/23/20108/23/20108/23/2010 4:23:56 PMPPART
Overhead work at the grid ceilings is approved for cover. Hydrostatic test of the new preaction system passed. Wet system hydro incomplete.
FIR10-00387 INSP-Sprinkler Rough-in8/23/20108/23/20108/23/2010 3:58:44 PMPPART
Okay to cover- noted new walls at the 2nd floor area of work are not yet built for final verification and approval of spacing/location.
FIR10-00198 FIR-Aging Inspection8/23/20108/23/20108/23/2010 3:31:45 PM DONE
Pending inspection request by contractor for permit final.
FIR10-00296 INSP-Sprinkler Rough-in8/23/20108/23/20108/23/2010 3:29:54 PMPPART
Fire sprinkler system modifications per the scope of remodel okayed for cover.
BLD10-00886 FIRE-Final Inspection8/23/20108/23/20108/23/2010 3:28:09 PMPPASS
Fire life safety passed.
FIR10-00358 INSP-Final Inspection8/23/20108/23/20108/23/2010 3:27:30 PMAPART
FIR10-00356 INSP-Sprinkler Rough-in/Hydro8/23/20108/23/20108/23/2010 3:26:59 PMAPART
Overhead work approved for cover.
BLD10-00123 FIRE-Conference8/23/20108/23/20108/23/2010 3:25:53 PMADONE
Regarding south exit stairway completion date.
BLD10-01335 FIRE-Sprinkler Rough-in8/23/20108/23/20108/23/2010 3:24:24 PMAPART
Overhead fire sprinkler work is approved for cover.