Inspections for the day of: Thursday, August 23, 2012.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00168 FIRE-Final Inspection8/23/20128/23/20128/23/2012 3:48:03 PMPPASS
Life safety passed
BLD12-00715 FIRE-Final Inspection8/23/20128/23/20128/23/2012 2:49:16 PMPPASS
Life safety passed
FIR11-00543 INSP-Sprinkler Rough-in/Hydro8/22/20128/23/20128/23/2012 1:46:46 PMPPART
Todays inspection was a rough to cover in basement and chiller. Earthquake bracing is missing on the 2 1/2" main in the basement. Tyler and I started inspection with the wrong set of plans. We decided to continue the inspection tomorrow with the correct set of plans and the earthquake bracing installed. Also it does not appear that the small orfice heads have been installed in the showers as required on 4/4/2012.
BLD12-01564 FIRE-Final Inspection8/22/20128/23/20128/23/2012 12:05:10 PMAPASS
life safety passed
BLD12-01530 FIRE-Final Inspection8/21/20128/23/20128/23/2012 10:37:59 AMAPASS
Life safety passed
BLD12-02219 FIRE-Final Inspection8/22/20128/23/20128/23/2012 9:58:58 AMAPASS
Life safety passed. The missing exit sign will be installed prior to the building inspection at the northwest exterior exit door.
FIR12-00379 INSP-Final Inspection8/22/20128/23/20128/23/2012 8:58:32 AMAPASS
permit finaled
FIR12-00374 INSP-Final Inspection8/21/20128/23/20128/23/2012 8:57:26 AMAPASS
Permit finaled
BLD12-01987 FIRE-Final Inspection8/22/20128/23/20128/23/2012 8:48:36 AMAFAIL
Repair the emergency light as discussed. All other items are ok.