BLD17-01329
| FIRE-Final Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 3:17:51 PM | P | CANC |
|
|
Jeff Phone #: ###-####
|
FIR17-00277
| INSP-Final Inspection | 8/22/2017 | 8/23/2017 | 8/23/2017 3:17:39 PM | P | FAIL |
|
|
Sync issue needs to be addressed as previously discussed.
|
FIR17-00303
| INSP-Sprinkler Rough-in | 8/23/2017 | 8/23/2017 | 8/23/2017 2:17:44 PM | P | PASS |
|
|
Remaining underground supply piping from the IBR to the point of connection can be covered.
|
BLD17-01710
| FIRE-Final Inspection | 8/22/2017 | 8/23/2017 | 8/23/2017 1:02:53 PM | P | PASS |
|
|
Life safety passed.
Kevin Phone #: ###-####
|
FIR17-00392
| INSP-Final Inspection | 8/22/2017 | 8/23/2017 | 8/23/2017 12:54:06 PM | P | PASS |
|
|
Permit finaled
|
FIR06-00062
| FIR-Aging Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 12:30:01 PM | | NR |
|
|
Contractor is out of business
|
BLD17-01860
| FIRE-Final Inspection | 8/22/2017 | 8/23/2017 | 8/23/2017 10:56:04 AM | A | FAIL |
|
|
Repair the exit signs/emergency lights and mount a tagged fire extinguisher as discussed.
|
NAF17-00040
| INSP-Final | 8/22/2017 | 8/23/2017 | 8/23/2017 9:56:22 AM | A | FAIL |
|
|
Provide exit discharge lights, provide missing exit signs and emergency lights, provide fire sprinkler modifications, mount fire extinguishers, mount address. Per conversation with scott arellano once all of the items except fire sprinklers are corrected a temporary occupancy can be allowed until sprinkler modifications are complete. Also per conversation with scott the fire sprinkler system will not require a sprinkler riser monitoring system. Per the site supervisor, Ben, State Fire is going to be the sprinkler contractor responcible for the modifications.
|
NAF17-00041
| INSP-Sprinkler Rough-in | 8/22/2017 | 8/23/2017 | 8/23/2017 8:46:32 AM | A | PASS |
|
|
Tie in piping is approved for cover. The fitting is going to repair the insulation/tenting in the new area. Per the general contractor the insulating contractor will tent the tie-ins. He will provide documentation to me when that work is done.
|
BLD17-02507
| FIRE-Final Inspection | 8/22/2017 | 8/23/2017 | 8/23/2017 8:22:13 AM | A | PASS |
|
|
Life safety passed.
|
FIR17-00275
| INSP-Sprinkler Rough-in/Hydro | 8/22/2017 | 8/23/2017 | 8/23/2017 7:55:26 AM | A | PASS |
|
|
Not ready for hydro. Rough-in passed but still waiting for the piping to be installed under overhead doors. Tim Frost approved the revised earthquake attachments. Also letter was received as required in note #1 of the review comments.
Randy Phone #: ###-####
|
NAF17-00054
| INSP-Final | 8/22/2017 | 8/23/2017 | 8/23/2017 12:00:00 AM | A | DONE |
|
|
Call prior to going Phone #: 2088672899 >> Inspection requested via mobile web by Bobbi Jordan
|