FIR16-00789
| INSP-Sprinkler Rough-in/Hydro | 8/22/2017 | 8/23/2017 | 8/23/2017 3:59:54 PM | P | PASS |
|
|
Hydrostatic test for overhead fire sprinkler piping complete.
|
FIR17-00067
| INSP-Sprinkler Rough-in/Hydro | 8/23/2017 | 8/23/2017 | 8/23/2017 2:47:07 PM | P | PASS |
|
|
Hydrostatic test for systems 10-3, 20-7 and 20-11 complete.
|
FIR16-00794
| INSP-Sprinkler Rough-in | 8/22/2017 | 8/23/2017 | 8/23/2017 2:26:27 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinjkler piping/tenting complete, approved for cover.
|
FIR16-00789
| INSP-Supply line flush | 8/22/2017 | 8/23/2017 | 8/23/2017 2:22:21 PM | P | DONE |
|
|
Underground main line flush complete.
|