ELE18-03160
| Electrical Rough-In | 8/22/2018 | 8/23/2018 | 8/23/2018 2:44:50 PM | P | PASS |
|
|
Lawrence Phone #: ###-#### Measurement of overhead line is over the 10' requirement. Permit holder had a string line set up to show that waters edge is not within 10' horizontal. Ok cover light at N end of pool.
|
ELE18-03228
| Electrical Rough-In | 8/23/2018 | 8/23/2018 | 8/23/2018 2:06:18 PM | P | PASS |
|
|
Ground works inspection only Phone #: ###-#### Inspection requested via web by Don Conley Ok cover conduit from house to new detached garage.
|
ELE18-02254
| Final | 8/23/2018 | 8/23/2018 | 8/23/2018 1:43:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Berthelot Ok final.
|
ELE18-01420
| Final | 8/22/2018 | 8/23/2018 | 8/23/2018 1:14:30 PM | P | FAIL |
|
|
garage code 0588 Phone #: ###-#### Inspection requested via web by Neal Rumsey Check notes on first inspection. WP at entry needs fixed. Screws visible through side of cover.
|
ELE17-00643
| Conference | 8/22/2018 | 8/23/2018 | 8/23/2018 12:47:00 PM | A | DONE |
|
|
call 20 mins ahead- late morning- Richard Phone #: ###-#### Discussed wire size and fittings for ac, dryer, and oven.
|
ELE18-03165
| Rough-In Permanent Service | 8/23/2018 | 8/23/2018 | 8/23/2018 11:31:04 AM | P | PASS |
|
|
Ben Phone #: ###-#### Looked at service at 9am this morning. Panel change and coordination with IDP to be onsite and re-evergize do to homeowner occupancy. Already energized. p/s o/h rec ok.
|
ELE18-02588
| Rough-In Permanent Service | 8/22/2018 | 8/23/2018 | 8/23/2018 11:01:47 AM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga Wrong inspection. Talked to Greg, he is going to call in correct inspection.
|
ELE18-02203
| Final | 8/22/2018 | 8/23/2018 | 8/23/2018 10:44:23 AM | A | PASS |
|
|
Garage code 1993 Phone #: ###-#### Inspection requested via web by Charles Davis Ok final.
|
ELE18-03196
| Final | 8/22/2018 | 8/23/2018 | 8/23/2018 10:22:46 AM | A | PASS |
|
|
Side gate next to garage is open Phone #: ###-#### Inspection requested via web by Jesse Fuentes Ok final. Hot tub re-located. No bonding of metal needed.
|
ELE18-02999
| Final | 8/22/2018 | 8/23/2018 | 8/23/2018 10:22:11 AM | A | PASS |
|
|
Side gate next to garage open Phone #: ###-#### Inspection requested via web by Jesse Fuentes Sunroom final ok,
|
ELE18-02668
| Final | 8/22/2018 | 8/23/2018 | 8/23/2018 10:05:55 AM | A | PASS |
|
|
Brian Phone #: ###-#### Looked at job during initial inspection. Some conduits were moved after. Received pics of little work that was done. Conduits are stubbed up and covered for future shop location.
|
ELE18-03218
| Electrical Rough-In | 8/22/2018 | 8/23/2018 | 8/23/2018 10:04:01 AM | A | PASS |
|
|
access 2758 Phone #: ###-#### Inspection requested via web by David Nelson Ok cover ceiling throughout, outlets in kitchen, and misc. lighting and outlets.
|
ELE18-01450
| Final | 8/22/2018 | 8/23/2018 | 8/23/2018 9:48:54 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot House is good. Pool not ready for final. Extension cord used to temp power for auto cover.
|
ELE13-01504
| ELE-Aging Inspection | 8/23/2018 | 8/23/2018 | 8/23/2018 7:22:16 AM | | FAIL |
|
|
Schedule a final inspection.
|