ELE17-02818
| ELE-Aging Inspection | 8/23/2019 | 8/23/2019 | 8/27/2019 1:30:17 PM | | PASS |
|
|
see final
|
ELE19-02345
| Final | 8/23/2019 | 8/23/2019 | 8/23/2019 10:37:01 AM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman NEC 230.70(A)(1) The service disconnecting means shall be installed at a readily accessible location
|
ELE19-02360
| Final | 8/23/2019 | 8/23/2019 | 8/23/2019 10:35:03 AM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman NEC 230.70(A)(1) The service disconnecting means shall be installed at a readily accessible location.
|
ELE19-02361
| Final | 8/23/2019 | 8/23/2019 | 8/23/2019 10:30:26 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman Final ok
|
ELE15-02152
| DOC - Permit Finaled | 8/23/2019 | 8/23/2019 | 8/23/2019 7:59:04 AM | A | PASS |
|
|
Contractor not awarded job, Doc Permit Final ok
|
ELE19-02995
| Electrical Rough-In | 8/21/2019 | 8/23/2019 | 8/23/2019 7:30:58 AM | A | PASS |
|
|
Rough in "OK to cover" has already passed, but Daryl wanted to see all the grounds tied together and all the naturals, that make sense to connect at this point tied together. All that work is complete and can be checked. If the inspection can be set up for first thing in the morning 7:30ish, I can be there for the inspection. Please text, so I will know to stay home later in the morning on Friday.
Thanks, Dustin Phone #: ###-#### Inspection requested via web by Dustin Inskeep Make-ups completed, nice job, Rough-in ok
|