Inspections for the day of: Thursday, August 24, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-02817 Water and/or Sewer8/23/20008/24/20008/24/2000 12:00:00 AMAPASS
PHIL--- ###-#### --SWR & WATER -RE-INSP
PLM00-02817 Water and/or Sewer8/23/20008/24/20008/24/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/23/2000 at 13:44:19. Contact: ###-####.
PLM00-02999 Sprinkler (Final)8/23/20008/24/20008/24/2000 12:00:00 AMAPART
main and drain partial Spud ###-####
PLM99-03863 Final8/23/20008/24/20008/24/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/23/2000 at 15:36:38. Contact: ###-####.
PLM00-03000 Water and/or Sewer8/23/20008/24/20008/24/2000 12:00:00 AMAPASS
BRIAN ###-#### WATER & SWR
PLM00-02968 Plumbing Rough-in8/23/20008/24/20008/24/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/23/2000 at 12:33:16. Contact: ###-####.
PLM00-02669 Sprinkler (Final)8/24/20008/24/20008/24/2000 12:00:00 AMAPASS
Added by Inspector: 330 On 8/24/2000 5990 sweetgum final ok with 2 clamps at each joint, homeowner was doing when i left 8/24/2000 8:47:41 AM
PLM00-02970 Groundwork8/24/20008/24/20008/24/2000 12:00:00 AMAPASS
Added by Inspector: 330 On 8/24/2000 gw ok just needs water service
PLM00-02500 Med/Gas Systems8/24/20008/24/20008/24/2000 12:00:00 AMPCANC
Added by Inspector: 330 On 8/24/2000 test
PLM00-02853 Sprinkler (Final)8/23/20008/24/20008/24/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/23/2000 at 12:58:26. Contact: . tie in covered eveerytig else looks ok 8/24/2000 8:58:07 AM
PLM00-02970 Plumbing Rough-in8/24/20008/24/20008/24/2000 12:00:00 AMPPART
rock-- ###-#### cell-- r/i --under slab
PLM00-02867 Plumbing Rough-in8/24/20008/24/20008/24/2000 12:00:00 AMPPASS
mary ###-#### wc lav 8/24/2000 3:34:32 PM